gomdot.com > divisions > consulting services > click lpa

24
1 GOMDOT.com > Divisions > Consulting Services > Click LPA All Consultant Services Division (CSU) Local Public Agency (LPA) Selection, Special Match Credit & Contract Templates

Upload: others

Post on 30-Nov-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GOMDOT.com > Divisions > Consulting Services > Click LPA

1

GOMDOT.com > Divisions > Consulting Services > Click LPA

All Consultant Services Division (CSU) Local Public Agency (LPA) Selection, Special Match Credit & Contract Templates

Page 2: GOMDOT.com > Divisions > Consulting Services > Click LPA

Parcel File Review Checklist 

Parcel # and Contact Information 

Title Certificate 

Donation Documentation 

Appraisal Report 

Review Appraisal Report 

Any X‐deed or Q‐Deed appraisals and review appraisals 

Signed and dated Waiver Valuation 

Signed and dated LPAs Establishment of Just Compensation form or LPA Board authorization 

Verification that Acquisition Guide and/or Relocation Guide was provided to the property owner 

Signed and dated Fair Market Value Offer 

Signed Contact Records for Acquisition and/or Relocation 

Documentation on counter‐offers and/or Administrative Adjustments 

Copies of RECORDED deeds, easements, q‐deeds, x‐deeds, transfer documents 

Copies of recorded Partial Releases and/or Cancellations of D/T, UCCs, tax liens, etc. 

Signed and dated appropriate relocation notices – 30 day, 90 day 

Relocation offers reviewed 

All relocation documents 

Recommendation for Condemnation Form 

Condemnation approval by LPA 

Copies of any and all cancelled checks paid to property owners for acquisition and/or relocation 

Closing costs sheets 

If condemned, need copy of recorded Order Granting Right of Entry or Agreed Order 

Copy of court deposits 

Page 3: GOMDOT.com > Divisions > Consulting Services > Click LPA

LPA-ROW-EZ Form Rev 08/21

RIGHT OF WAY CERTIFICATION REPORT Name of LPA: Project Termini: FMS Project No.: External Project No.__________________________________ County: Date:

Yes No

(1) The LPA certifies that all project activities will take place on existing ROW and noadditional ROW is required.

(2) The LPA certifies that based on a site inspection of the right of way for the projectthe right of way is clear of encroachments.

(3) The LPA certifies that there are no improvements that remain within the projectright of way limits.

(4) The LPA certifies that the project has been inspected and there are no visibleindications of potentially contaminated sites within the proposed right of way.

(5) The LPA certifies that the project right of way does not contain structures thatrequired asbestos abatement.

(6) The LPA certifies that there are no utilities in conflict with the project.

(7) The LPA certifies that there are no railroads facilities affected by the abovereferenced project.

If the project requires any additional ROW, or the LPA cannot certify yes to any of the seven certifications listed above, then the LPA must complete the appropriate status report found in the MDOT-LPA Project Development Manual's (PDM) Chapter 5, section 11 and include with this Report. Any errors to this certification will be the responsibility of the certifying LPA.

The LPA certifies that the LPA will accept full financial responsibility for any damage caused, or delay claims that arise, in whole or in part, due to the failure of the LPA to remove, relocate or adjust, or clear any encroachment, utility, or contaminated site. Any additional construction costs incurred as a result of working around any encroachment, utility, or contaminated site will be paid by the LPA as a non-reimbursable expense.

LPA Project Director (Print)

_________________ Signature Date

__________________________ __________________ MDOT District Utility Coordinator Date (For verification of Utilities only)

Page 4: GOMDOT.com > Divisions > Consulting Services > Click LPA

 

 

Page 5: GOMDOT.com > Divisions > Consulting Services > Click LPA

Revised 4/1/2011 

 

      

MONTHLY PROJECT STATUS REPORTReporting Period:   

LPA   Consultant   Project No.   

Project Description:   

 I. Work completed (Brief Summary of work completed during reporting period)            

II. Work Planned (Brief Summary of work planned for next reporting period)            

III. Request for MDOT Response (Information required from MDOT to continue project development)               

   

twampler
Text Box
10/28/2013
Page 6: GOMDOT.com > Divisions > Consulting Services > Click LPA

Revised 10/28/2013 TGW

LPA:External Project No:

FMS Project No:Proj. Description:

IV. Project Status Log

A B C D

Original Anticipated

Date for each Item

Current Revised

Anticipated Date

Actual Date Submitted

ActualDate

Approved

1 MOU2 PE Consultant Selection (LPA may select CEI at same time)

3 Kick-off Meeting4 ENV Action Decided (same as date for Kick-off Mtg)

5 PE Contract6 ENV Document7 LPA-1008 LPA-700/8009 Field Review Plans (allow 21 calendar days for MDOT Review)

10 Field Review Meeting11 Office Review PS&E (allow 21 calendar days for MDOT Review)

12 Office Review Meeting13 DBE Goal (Assigned by MDOT based on O.R. constr est.)

14 STIP Rechecked/Amended (for Non-Grouped Projects Only)

15 ROW Status Reports (14 calendar days prior to PSE Submittal)

16 CE&I Consultant Selection (if not simultaneous with PE selection)

17 CE&I Contract (14 calendar days prior to PSE Submittal)

18 Sampling & Testing Proposal (14 calendar days prior to PSE Submittal)

19 PS&E Assembly20 Final PS&E Assembly21 Authority to Advertise Letter from MDOT (approved PS&E) MOU Obligation Deadline:

Instructions to LPA/Consultant

Column A: Original Anticipated Date -- These are target dates for project design

Column B: Current Revised Anticipated Dates

Column C: Actual Date Submitted

Column D: Actual Date Approved

Signature of LPA Consultant/Professional: Date:

Signature of LPA Project Director: Date:

Note: The LPA/consultant is responsible for submitting this signed form to the District LPA Coordinator by the 7th of each month (via email).

These dates are to be filled in as the LPA/Consultant receives responses from MDOT. Please note any item submitted and awaiting a response from MDOT on Page 1, Section C of this report

Item No. Status/RemarksItem

Dates in this column should be reviewed and updated monthly. The fields in this column can be changed throughout the development of the project depending on the delays/challenges that may arise. Provide an explanation for the revised date under the Status/Remarks.

ALL fields in this column should be filled out once at the beginning of the project. These dates in this column should not be modified after the initial submittal of this form.

These dates should be filled in as the LPA/Consultant submits each item.

Page 7: GOMDOT.com > Divisions > Consulting Services > Click LPA

Form

CSD

-612

LPA

Rev.

8/2

020

NO

.DE

SCRI

PTIO

N1

Misc

ella

neou

s10

-20,

60-

130,

160

, 210

-230

2Ex

cava

tion

and

Drai

nage

3Ba

se a

nd P

avem

ent

4Pe

dest

rian

Faci

litie

s30

, 170

-200

5Tr

affic

Saf

ety

40, 5

0 6

Pave

men

t Mar

king

s14

0-15

0, 2

40-3

90

7Br

idge

s/Re

tain

ing

Wal

ls

Add

Opt

ion

#1

5Tr

affic

Saf

ety

40, 5

0

6Pa

vem

ent M

arki

ngs

140-

150,

240

-390

LET:

02/0

1/20

Antic

ipat

ed N

OA:

03/0

1/20

Antic

ipat

ed N

TP/B

CT:

05/0

1/20

Wor

king

Day

s:10

1 (B

ase)

172

WO

RKIN

GDA

YSPE

R YE

AR

Clos

eout

010

1

1981

112

101

112

1 Pr

inci

ple

(par

t tim

e)

81

101

Star

tup

NO

TE:

THE

ANTI

CIPA

TED

WO

RKIN

G D

AYS

SHO

WN

ON

TH

IS S

CHED

ULE

ARE

INFO

RMAT

ION

AL P

URP

OSE

S O

NLY

.

THE

ACTU

AL W

ORK

ING

DAY

TO

TAL

AS A

SSES

SED

BY T

HE

PRO

JECT

EN

GIN

EER

ON

FO

RM C

SD-7

65 S

HAL

L G

OVE

RN.

2120

16SE

PTEM

BER

OCT

OBE

RN

OV

DEC

67

1115

1920

1 Pr

ojec

t Eng

inee

r (pa

rt ti

me)

1 Cl

eric

al (p

art t

ime)

2121

2016

115

APRI

LM

AYJU

NE

JULY

AUG

UST

1 In

spec

tor I

V

SEPT

EMBE

RO

CTO

BER

NO

VDE

CAP

RIL

MAY

JUN

EJU

LYAU

GU

STJA

NFE

BM

ARCH

YEAR

2020

WO

RK P

HASE

LIN

E N

UM

BERS

2021

67

1115

19JA

NFE

BM

ARCH

APRI

LM

AY

APRI

LM

AY

PRO

JECT

NU

MBE

R

COU

NTY

MO

NTH

ANTI

CIPA

TED

WO

RKIN

G D

AYS

PER

MO

NTH

JAN

FEB

MAR

CH11

5

PRO

GRE

SS S

CHED

ULE

JUN

EJU

LYAU

GU

STSE

PTEM

BER

OCT

OBE

RN

OV

DEC

NO

VDE

CJU

NE

JULY

AUG

UST

SEPT

EMBE

RO

CTO

BER

JAN

FEB

MAR

CH

YEAR

2021

8110

1

561

EVER

YTH

ING

ABO

VE T

HIS

RO

W IS

REQ

UIR

ED T

O B

E SU

BMIT

TED

AN

D A

PPRO

VED

AS

PART

OF

THE

PREL

IMIN

ARY

ENG

INEE

RIN

G C

ON

TRAC

T.EV

ERYT

HIN

G B

ELO

W T

HIS

RO

W S

HO

ULD

BE

ADD

ED T

O T

HE

APPR

OVE

D P

ROG

RESS

SCH

EDU

LE A

S PA

RT O

F TH

E CE

&I C

ON

TRAC

T.

Page 8: GOMDOT.com > Divisions > Consulting Services > Click LPA

8

Page 9: GOMDOT.com > Divisions > Consulting Services > Click LPA

9

Page 10: GOMDOT.com > Divisions > Consulting Services > Click LPA

10

Page 11: GOMDOT.com > Divisions > Consulting Services > Click LPA

11

Page 12: GOMDOT.com > Divisions > Consulting Services > Click LPA

12

Page 13: GOMDOT.com > Divisions > Consulting Services > Click LPA

13

Page 14: GOMDOT.com > Divisions > Consulting Services > Click LPA

14

Page 15: GOMDOT.com > Divisions > Consulting Services > Click LPA

15

Page 16: GOMDOT.com > Divisions > Consulting Services > Click LPA

16

Page 17: GOMDOT.com > Divisions > Consulting Services > Click LPA

17

Page 18: GOMDOT.com > Divisions > Consulting Services > Click LPA

18

Page 19: GOMDOT.com > Divisions > Consulting Services > Click LPA

19

Page 20: GOMDOT.com > Divisions > Consulting Services > Click LPA

20

Page 21: GOMDOT.com > Divisions > Consulting Services > Click LPA

21

Page 22: GOMDOT.com > Divisions > Consulting Services > Click LPA

22

Page 23: GOMDOT.com > Divisions > Consulting Services > Click LPA

23

Page 24: GOMDOT.com > Divisions > Consulting Services > Click LPA

24