8・5 - field inspection items
DESCRIPTION
8・5 - Field Inspection Items. 8.5.1 Visual inspection and verification test of structure and quantity ( 1 ) Photovoltaic module ( 2 ) Support structure for photovoltaic module ( 3 ) Power conditioner ( 4 ) Display system - PowerPoint PPT PresentationTRANSCRIPT
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
1
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
8・58・5 -- Field Inspection ItemsField Inspection Items
8.5.1 Visual inspection and verification test of structure and quantity
( 1 ) Photovoltaic module
( 2 ) Support structure for photovoltaic module
( 3 ) Power conditioner
( 4 ) Display system
( 5 ) Junction box, Interconnection switchboard, MCB
8.5.2 Equipment installation and wiring/connection inspection
( 1 ) Equipment installation inspection
( 2 ) Wiring/connection verification test
8.5.3 Insulation resistance test
( 1 ) Wiring between photovoltaic modules
( 2 ) Wiring between various equipment
8.5.4 Open-circuit voltage test/earth resistance test
( 1 ) Open-circuit voltage of photovoltaic module
( 2) Earth resistance when systems are interconnected
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
2
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
8.5.1 - Visual inspection and verification test of structure and quantity
( 1 ) Photovoltaic module visual inspection and power output test
Item Inspection details Means of inspection Result
Appearance
・ Check if there is any damage, cracking or deformation in the photovoltaic module appearance.
Visual inspection
・ Confirm that photovoltaic modules are appropriately arranged.
Consistent with Tech. Spec.
drawings
Power output
・ Check against manufacturers’ shop inspection records on behalf of conducting field output tests.
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
3
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
( 2 ) Visual inspection of Support structure for photovoltaic module array
Item Inspection details Means of inspection Result
Appearance
There is no deformation or strain. Visual inspection
There is no peeling of galvanized steel welded to support structure.
Visual inspection
The support structure is appropriately arranged.
Consistent with Tech. Spec. drawings
Installation
There is no loosening in screws, bolts and fixtures.
Visual inspection
Bolt tightening is appropriately conducted. Visual inspection
Wiring
There is no loosening in the connections between photovoltaic modules.
No loosening is confirmed by touching
and visually.
Exposed cables behind the photovoltaic module are wired in order.
Visual inspection
Cables are supported by fixing devices. Visual inspection
Earth cables are connected to the array support structure.
Visual inspection
8.5.1 - Visual inspection and verification test of structure and quantity
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
4
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
( 3 ) Power conditioner
Item Inspection details Means of inspection Result
AppearanceThere is neither peeling of surface coating nor deformation.
Visual inspection
InstallationThere is no loosening in screws, bolts and fixtures.
Visual inspection
Wiring
P/N ( +/- ) are correctly connected at the power conditioner input.
Visual inspection, tester
R/S/T are correctly connected at the three-phase output.
Visual inspection, tester
Low voltage cable +/- are correctly connected at its input/output.
Visual inspection, tester
Earth cables are connected. Visual inspection
Cables are connected in order. Visual inspection
The panel internal is clean. Visual inspection
Visual inspection
8.5.1 - Visual inspection and verification test of structure and quantity
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
5
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
( 3 ) Power conditioner
Item Inspection details Performance Result Remarks
Model/typeCheck the type of power conditioner against Tech. Spec.
Acceptable
Protective relay test (at shop)
Check against shop inspection records on behalf of field relay tests.
Check against shop inspection records.
Islanding phenomen
on detection
MCCB ( ELCB ) is turned off and operation is shutdown in an instance.
Acceptable
20 seconds standby
after power restoration
The power conditioner automatically starts 20 seconds after power restoration.
20
Restart on S.
Acceptable
The time to restoration shall be consistent with Tech. Spec.
Performance test
Performance test
Regarding output inspection/test of relays, check against manufacturers’ shop inspection records on behalf of conducting field inspection/test.
8.5.1 - Visual inspection and verification test of structure and quantity
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
6
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
( 4 ) Display system
Item Inspection details Means of inspection Result
AppearanceThere is neither peeling of surface coating nor deformation.
Visual inspection
Installation There is no loosening in screws, bolts and fixtures. Visual inspection
Nameplate There is no defect to or peeling of nameplate. Visual inspection
Wiring
AC200V control power cables are correctly wired. Visual inspection, tester
Low voltage cables are correctly wired and there is conduction.
Visual inspection, tester
Cables are wired in order. Visual inspection
The panel internal is clean. Visual inspection
Visual inspection
LED verification test Item Inspection details Means of inspection Result
Verification of quantity
The generated electricity is consistent with the total of the numerical values shown in the power conditioner LCD. Visual inspection
* Input signals from the secondary cable in the transducer inside the interconnection switchboard to verify the indicated values on the LED screen.
* Visually check the numerical values indicated by power conditioner panel LCD or data collection system monitor to verify there is no error in the generated electricity of photovoltaic module and inverter output.
8.5.1 - Visual inspection and verification test of structure and quantity
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
7
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
( 5 ) Junction box, interconnection switchboard and MCB
Item Inspection detailsMeans of inspection
Result
AppearanceThere is neither peeling of surface coating nor deformation.
Visual inspection
Installation There is no loosening in screws, bolts and fixtures.
Visual inspection
Wiring
P/N ( +/- ) are correctly connected at the junction box input.
Visual inspection,
tester
P/N ( +/- ) are correctly connected at the MCCB output.
Visual inspection,
tester
Earth cables are connected.Visual
inspection
Cables are wired in order.Visual
inspection
The panel internal is clean.Visual
inspection
Visual inspection of junction box-1
8.5.1 - Visual inspection and verification test of structure and quantity
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
8
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
( 5 ) Junction box, interconnection switchboard and MCB
Item Inspection detailsMeans of inspection
Result
AppearanceThere is neither peeling of surface coating nor deformation.
Visual inspection
Installation There is no loosening in screws, bolts and fixtures. Visual inspection
Wiring
U/V/W are correctly connected at the inverter input.Visual inspection,
tester
U/V/W are correctly connected at the main MCCB output.
Visual inspection, tester
Earth cables are connected. Visual inspection
Cables are wired in order. Visual inspection
The panel internal is clean. Visual inspection
U/V/W phase indicator shows the positive phase at the inverter input
Visual inspection, phase indicator
Visual inspection of interconnection switchboard
8.5.1 - Visual inspection and verification test of structure and quantity
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
9
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
(5) Junction box, interconnection switchboard and MCB
Item Inspection detailsMeans of inspection
Result
AppearanceThere is neither peeling of surface coating nor deformation.
Visual inspection
Installation There is no loosening in screws, bolts and fixtures. Visual inspection
wiring
U/V/W are correctly connected at the main MCCB input.
Visual inspection, tester
U/V/W are correctly connected at the main MCCB output.
Visual inspection, tester
Earth cables are connected. Visual inspection
Cables are wired in order. Visual inspection
The panel internal is clean. Visual inspection
U/V/W phase indicator shows the positive phase at main MCCB output.
Visual inspection, phase indicator
Visual inspection of MCB
8.5.1 - Visual inspection and verification test of structure and quantity
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
10
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
8.5.2 - Equipment installation and wiring/connection inspection
( 1 ) , ( 2 ) Insulation resistance measurement of cable between junction box and inverter panel
Insulation resistance measurement of cable between inverter and interconnection witchboard
Insulation resistance measurement of cables between interconnection switchboard, MCB and existing transducers
[ Test procedure ]
Measure the insulation resistance of ( + ,-) polarities and ( R , S,T ) phases of each cable to ensure that there is no insulation failure.
Measure the insulation resistance between each cable and the ground (according to the rules for internal cables).
[ Acceptance criteria ]
Measured voltage > 600V : Acceptable if measurement using 1000V megger shows 0.4MΩ or igher .
Measured voltage > 300V : Acceptable if measurement using 500V megger shows 0.4MΩ or higher
Measured voltage > 150V : Acceptable if measurement using 500V megger shows 0.2MΩ or higher.
Measured voltage > 150V : Acceptable if measurement using 500V megger shows 0.1MΩ or higher.
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
11
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
8.5.2 -Equipment installation and wiring/connection inspection
Measurement of cable insulation resistance
Item Insulation resistance ( M )
Cable type Result
Junction box-1~ Inverter-1
P (+) 100MΩ or higher CV10sq-4CEarth cable 1C, spare cable 1CN (-) 100MΩ or higher
Junction box-2~ Inverter-2
P (+) 100MΩ or higher CV10sq-4CEarth cable 1C, spare cable IC
N (-) 100MΩ or higher
Junction box-3~ Inverter-3
P (+) 100MΩ or higher CV10sq-4CEarth cable 1C, spare cable IC
N (-) 100MΩ or higher
Inverter-1 ~ Interconnection switchboard
R ( red ) 100MΩ or higher
CV14sq-4CS ( black ) 100MΩ or higher
T ( blue ) 100MΩ or higher
N ( white ) 100MΩ or higher
Interconnection switchboard ~ MCB
R ( red ) 100MΩ or higher
CV100sq-4CS ( black ) 100MΩ or higher
T ( blue ) 100MΩ or higher
N ( white ) 100MΩ or higher
MCB ~ Existing transducer-9
R ( red ) 100MΩ or higher
CV100sq-4CS ( black ) 100MΩ or higher
T ( blue ) 100MΩ or higher
N ( white ) 100MΩ or higher
>600V
>600V
>600V
>300V
>300V
>300V
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
12
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
8.5.3 - Equipment installation and wiring/connection inspection
( 1 )、( 2 ) Insulation resistance measurement of cables between photovoltaic modules
[ Test procedure ] Measure the insulation resistance of ( + ,-) polarities and ( R, S, T) phases of each cable for
one string of photovoltaic module array to verify that there is no insulation failure.
Measure the insulation resistance between each cable and the ground (*The insulation resistance of the cable including the photovoltaic module will be measured).
[ Acceptance criteria ] Open-circuit voltage≧300V : Acceptable if measurement using 1000V megger shows 0.4MΩ or
higher .
Measurement of cable insulation resistance
Module No.Insulation resistance
( M ) Cable used Result
Junction box-1
PV1-1 + 65MΩ or higher Manufacturer’s standard type ( 4sq-5C )1C earth cable, spare cable 2C
Acceptable
PV1-1 - 100MΩ or higher Acceptable
PV1-2 + 100MΩ or higher Manufacturer’s standard type ( 4sq-5C )1C earth cable, spare cable 2C
Acceptable
PV1-2 - 200MΩ or higher Acceptable
PV1-3 + 150MΩ or higher Manufacturer’s standard type ( 4sq-5C )1C earth cable, spare cable 2C
Acceptable
PV1-3 - 200MΩ or higher Acceptable
PV1-4 + 100MΩ or higher Manufacturer’s standard type ( 4sq-5C )1C earth cable, spare cable 2C
Acceptable
PV1-4 - 200MΩ or higher Acceptable
PV1-5 + 50MΩ or higher Manufacturer’s standard type ( 4sq-5C )1C earth cable, spare cable 2C
Acceptable
PV1-5 - 90MΩ or higher Acceptable
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
13
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
8.5.4 - Open-circuit voltage test/earth resistance test
( 1 ) DC Open-circuit voltage of cables between photovoltaic modules
The crystalline photovoltaic power generation system consists of 270 panels of 167 W module.
Eighteen modules ( 167W ) in series ×fifteen modules in parallel constitute a photovoltaic power generation system.
The open-circuit voltage of one module is about 43.1V ( at the highest ) with an error of ±10%. Accordingly, the nominal voltage of one module accounts for 43.1V×0.9 ~1.1 = 38.79 ~ 47.41V.
The maximum open-circuit voltage of one circuit consisting of 18 modules will be:
38.8V×18 modules = 698.22V ( lower limit )
47.4V×18 modules = 853.38V ( upper limit )
[ Test procedure ]
・ Measure the open-circuit voltage of one each string of photovoltaic module array to confirm the polarity of each circuit.
・ Measure the open-circuit voltage of one each string of photovoltaic module array to check if the number of modules in series is correct or not.
< If the measured voltage is out of the acceptance criteria, the modules in series might be incorrectly connected. >
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
14
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
8.5.4 - Open-circuit voltage test/earth resistance test
( 1 ) DC Open-circuit voltage of cables between photovoltaic modules
[ Test conditions ]
Tests shall be conducted during daytime hours on a sunny day. ( Solar radiation shall be 0.1kW/m2 or higher. )
[ Acceptance criteria ]
Measure the open-circuit voltage of one each string of module array to confirm that it meets the following criteria.
Measurement at junction box
Module train No.Junction box-1
Polarity ( + , - ) Open-circuit voltage (Voc)Acceptance criteria
698V ~ 853V
Junction box-1
PV1-1 O.K 744.0V Acceptable
PV1-2 O.K 740.0V Acceptable
PV1-3 O.K 737.0V Acceptable
PV1-4 O.K 735.0V Acceptable
PV1-5 O.K 734.0V Acceptable
e8 /
PPA
Sol
ar P
V D
esig
n Im
plem
enta
tion
O&
M
15
Mar
shal
l Isl
ands
Mar
ch 3
1-A
pril
11, 2
008
8.5.4 - Open-circuit voltage test/earth resistance test
( 2 ) Earth resistance measurement
[ Test procedure ]
Measure the earth resistance.
[ Acceptance criteria ]
Earth resistance of 100 or less is acceptable.
Earth resistance
Item Measured value Result
Interconnection point 1.6Ω Acceptable