› energy wp 2012: priorities and topics piotr Świątek, ncp energy
TRANSCRIPT
›
Energy WP 2012: priorities and topics
Piotr Świątek, NCP Energy
Solar EnergyPhotovoltaics CSP
Wind EnergyWind energy
Bio EnergyBioenergy
Other renewable energiesOcean Hydro Geothermal
Fuel cells and hydrogenFuel cells and hydrogen
Energy networksSmart grid
Clean coal/CCSClean coal/CCS Coal and steel (RFCS)
Energy efficiencyEfficiency and savings
FP7 ENERGY RESEARCH
Horizontal aspectsSocio-economic research Future emerging technologies & materials
Examples of EU – Funding schemes - Focus Energy
ENERGIE / FP7 - RTDENERGIE / FP7 - Demo
IEE / CIP
FCH - JTI
Research ….. Application ….. Pilot .…. Prototype ….. Series …..
ESF
LIFE
EERPERCRFCS
NMP… / FP7
Operational ProgrammesLIFE work programme
Implementation: projects, networks, award of grants and subsidies, etc.
work programme – work programme – work programme
Capacities:4,1 Bn
• Regions of Knowledge (126 M) • Dev Research policy (CREST, ERA-Watch, OMC-Nets) (70 M)• SME research (1,3 Bn)•Research potential of cohesion regions (340M) • Science & Society. (280 M) •Infrastructure (1,7 Bn) incl Risk sharing finance facility (RSFF)
Cooperation: 32,4 Bn
Themes: Energy (2,3 Bn); Environment (1,9 Bn); Space (1,4 Bn); Social & Econ.Sciences (0,6 Bn)ICT (9 Bn); etcFormats:• JTI (incl Risk sharing finance facility RSFF)• Art 169: cooperation of nat. Programmes • ERA-Nets (plus)
etc
Enterprise &Innovation (EIP)
2,1 Bn• Financial instruments (1,1 Bn)• Service networks: SME consultancy, Technology-transfer, FP7 participation, • IPR use and awareness• Networking of actors: policy development and learning • Analysis and studies • e-business • Eco-innovation (430 M): market replication; Financial instruments , Networking
Etc.
ICT 728 M
(ma
rket up
-take IC
T; e
-lea
rning
; ICT
ap
plica
tion)
Inte
llige
nt E
ne
rgy
Eu
rop
e (IE
E) 727 M
(E
nerg
y efficien
cy; marke
t up-ta
ke; aw
aren
ess ra
ising)
ERDF, ESF, Cohesion Fund
Objectives:• Convergence (251 Bn)• Competitiveness & employment (49,1 Bn; ERDF, ESF)• Territorial cooperation (successor to INTERREG) (7,75 Bn)Priorities:Research, Innovation, Environment New Instruments:JEREMIE (SME financial instrument)JESSICA urban dev.JASPERS technical assistance
+ EAFRD & EFF
Comenius (preschool, comp. and Upper Sec)
Leonardo da Vinci (vocational edu. & training)
Erasmus (university level scholarships )ErasmusMundus (third country)
Grundtvig (adult education)
E Twinning : ICT in schoolsTransversal Act.
En
viro
nm
en
t: po
licy mon
itorin
g & p
olicy
de
velo
pm
en
t; NG
O p
rojects
5 Committees
10 Com-mittees
CommitteeCom-mittee
Com-mittee
Ideas:Fundamental research (ERC) 7,5 Bn
People:Marie-Curie-Scholarships (4,7 Bn)
JRC (Joint Research Centres) 1,75 Bn
3Committees
Committees
Managing Authorities (Member States &
Regions
LIFE+
EIT
LIFE+2,1 Bn
StructuralFunds347 Bn
CIPCompetitveness & Innovation
3,6 Bn
FP7Research and Development
54 Bn
LLPEducation &
Training 6,2 Bn
AgenciesMember States /
COM
• FP7 Agency(People, SME)
• ERC (Ideas)
COM(INFSO)
COM(ENTR,
ENV)
COM(RTD, ENERGY, MOVE, INFSO)
EIB/EIF:CIP financial instruments, FP7: RSFF
CIP Agency
EACI
Regions / MS / AgenciesBodies for territorial
cooperation
EIF:JEREMIE
EII
Energy in Cooperation Program
Nationale Kontaktstelle Energie: [email protected]
Calls ENERGY-2012
Call identifier Title Published Deadline Budget Submission
FP7-ENERGY-2012-1 ENERGY CALL PART 1 19.07.2011 25.10.2011 150 Two stage
FP7-ENERGY-2012-2 ENERGY CALL PART 2 19.07.2011 08.03.2012 81 One stage
FP7-ENERGY-SMARTCITIES-2012
Smart Cities And Communities 19.07.2011 01.12.2011 40 One stage
FP7-ERANET-2012-RTD
ERA-NET PLUS - BIOENERGY DEMONSTRATIONS OF THE EUROPEAN INDUSTRIAL BIOENERGY INITIATIVE
10
FP7-2012-NMP-ENV-ENERGY-ICT-EeB
DEMONSTRATION OF ZERO CARBON BUILDING RENOVATION FOR CITIES AND DISTRICTS
35
Nationale Kontaktstelle Energie: [email protected]
Calls ENERGY-2012
Call identifier Title Released Deadline Budget Evaluation
FP7-ENERGY-2012-1 ENERGY CALL PART 1 19.07.2011 25.10.2011 150 Two-step
FP7-ENERGY-2012-2 ENERGY CALL PART 2 XX.07.2011 08.03.2012 81 Single step
FP7-ENERGY-SMARTCITIES-2012
Smart Cities And Communities XX.07.2011 01.12.2011 40 Singel step
FP7-ERANET-2012-RTD
ERA-NET PLUS - BIOENERGY DEMONSTRATIONS OF THE EUROPEAN INDUSTRIAL BIOENERGY INITIATIVE
10
FP7-2012-NMP-ENV-ENERGY-ICT-EeB
DEMONSTRATION OF ZERO CARBON BUILDING RENOVATION FOR CITIES AND DISTRICTS
35
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY.2: RENEWABLE ELECTRICITY GENERATION
2.1: PHOTOVOLTAICS
ENERGY 2012.1.1: Reliable, cost-effective, highly performing PV systems CP 2012-1
Energy.2012.2.1-2: Demonstration of multifunctional PV modules CP
demonstration2012-2
2.3: WIND
ENERGY.2012.2.3.1: Innovative wind conversion systems (10-20MW) for offshore applications
CP 2012-1
Energy.2012.2.3-2: Demonstration of innovative designs to reduce fatigue loads and improve reliability of multi-MW turbines
CPdemonstration
2012-2
2.5: CONCENTRATED SOLAR POWER
ENERGY.2012.2.5.1: Research, development and testing of solar dish systems CP 2012-1
ENERGY.2012.2.5.2: Hybridisation of CSP with other energy sources CP 2012-1
2.6: OCEAN Energy.2012.2.6-1: Demonstration and deployment of first ocean energy farmsCP
demonstration2012-2
.2.9: CROSS-CUTTING ISSUES ENERGY.2012.2.9.1: Power generation in the low temperature range CP 2012-1
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY 3: RENEWABLE FUEL PRODUCTION
3.2: SECOND GENERATION FUEL FROM BIOMASS
ENERGY.2012.3.2.1: Biofuels from microalgae or macroalgae CP 2012-1
ENERGY.2012.3.2.2: Development and testing of advanced sustainable bio-based fuels for air transport
CP 2012-1
Energy.2012.3.2.3: Pre-commercial industrial scale demonstration plant on lignocellulosic ethanol
CPdemonstration
2012-2
3.7: CROSS-CUTTING ISSUESENERGY.2012.3.7.1: Development of new or improved logistics for lignocellulosic biomass harvesting, storage and transport
CPsmall & medium
size2012-1
Nationale Kontaktstelle Energie: [email protected]
Calls ENERGY-2012
Call identifier Title Released Deadline Budget Evaluation
FP7-ENERGY-2012-1 ENERGY CALL PART 1 19.07.2011 25.10.2011 150 Two-step
FP7-ENERGY-2012-2 ENERGY CALL PART 2 XX.07.2011 08.03.2012 81 Single step
FP7-ENERGY-SMARTCITIES-2012
Smart Cities And Communities XX.07.2011 01.12.2011 40 Singel step
FP7-ERANET-2012-RTD
ERA-NET PLUS - BIOENERGY DEMONSTRATIONS OF THE EUROPEAN INDUSTRIAL BIOENERGY INITIATIVE
10
FP7-2012-NMP-ENV-ENERGY-ICT-EeB
DEMONSTRATION OF ZERO CARBON BUILDING RENOVATION FOR CITIES AND DISTRICTS
35
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY.2: RENEWABLE ELECTRICITY GENERATION
2.1: PHOTOVOLTAICS
ENERGY 2012.1.1: Reliable, cost-effective, highly performing PV systems CP 2012-1
Energy.2012.2.1-2: Demonstration of multifunctional PV modules CP
demonstration2012-2
2.3: WIND
ENERGY.2012.2.3.1: Innovative wind conversion systems (10-20MW) for offshore applications
CP 2012-1
Energy.2012.2.3-2: Demonstration of innovative designs to reduce fatigue loads and improve reliability of multi-MW turbines
CPdemonstration
2012-2
2.5: CONCENTRATED SOLAR POWER
ENERGY.2012.2.5.1: Research, development and testing of solar dish systems CP 2012-1
ENERGY.2012.2.5.2: Hybridisation of CSP with other energy sources CP 2012-1
2.6: OCEAN Energy.2012.2.6-1: Demonstration and deployment of first ocean energy farmsCP
demonstration2012-2
.2.9: CROSS-CUTTING ISSUES ENERGY.2012.2.9.1: Power generation in the low temperature range CP 2012-1
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY.3: RENEWABLE FUEL PRODUCTION
3.2: SECOND GENERATION FUEL FROM BIOMASS
ENERGY.2012.3.2.1: Biofuels from microalgae or macroalgae CP 2012-1
ENERGY.2012.3.2.2: Development and testing of advanced sustainable bio-based fuels for air transport
CP 2012-1
Energy.2012.3.2.3: Pre-commercial industrial scale demonstration plant on lignocellulosic ethanol
CPdemonstration
2012-2
3.7: CROSS-CUTTING ISSUESENERGY.2012.3.7.1: Development of new or improved logistics for lignocellulosic biomass harvesting, storage and transport
CPsmall & medium
size2012-1
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY 4: RENEWABLES FOR HEATING AND COOLING
4.1: LOW/MEDIUM TEMPERATURE SOLAR THERMAL ENERGY
ENERGY.2012.4.1.1: Research and development for medium temperature range solar collectors (100°-250°C)
CP 2012-1
ACTIVITY ENERGY.5: CO2 CAPTURE AND STORAGE TECHNOLOGIES FOR ZERO EMISSION POWER GENERATION
5.2: CO2 STORAGE
ENERGY.2012.5.2.1: Sizeable pilot tests for CO2 geological storageCP
Funding from third parties
2012-1
ENERGY.2012.5.2.2: Impact of the quality of CO2 on transport and storage behaviour
CP 2012-1
ACTIVITY ENERGY 5&6: CROSS-CUTTING ACTIONS BETWEEN ACTIVITIES ENERGY.5 AND ENERGY.6
5&6.2: CROSS CUTTING AND REGULATORY ISSUES
Energy.2012.5&6.1-1 Pilot plant-scale demonstration of advanced post-combustion CO2 capture processes with a view to integration in fossil fuel power plants
CPdemonstration
2012-2
Energy.2012.5&6.1-2: Pilot plant-scale demonstration and integration of emerging and new combustion technologies
CPdemonstration
2012-2
ENERGY.2012.5&6.2.1: Support to the coordination of stakeholders' activities in the field of Zero Emission Energy Production
CSA-SA 2012-1
Nationale Kontaktstelle Energie: [email protected]
Calls ENERGY-2012
Call identifier Title Released Deadline Budget Evaluation
FP7-ENERGY-2012-1 ENERGY CALL PART 1 19.07.2011 25.10.2011 150 Two-step
FP7-ENERGY-2012-2 ENERGY CALL PART 2 XX.07.2011 08.03.2012 81 Single step
FP7-ENERGY-SMARTCITIES-2012
Smart Cities And Communities XX.07.2011 01.12.2011 40 Singel step
FP7-ERANET-2012-RTD
ERA-NET PLUS - BIOENERGY DEMONSTRATIONS OF THE EUROPEAN INDUSTRIAL BIOENERGY INITIATIVE
10
FP7-2012-NMP-ENV-ENERGY-ICT-EeB
DEMONSTRATION OF ZERO CARBON BUILDING RENOVATION FOR CITIES AND DISTRICTS
35
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY.2: RENEWABLE ELECTRICITY GENERATION
2.1: PHOTOVOLTAICS
ENERGY 2012.1.1: Reliable, cost-effective, highly performing PV systems CP 2012-1
Energy.2012.2.1-2: Demonstration of multifunctional PV modules CP
demonstration2012-2
2.3: WIND
ENERGY.2012.2.3.1: Innovative wind conversion systems (10-20MW) for offshore applications
CP 2012-1
Energy.2012.2.3-2: Demonstration of innovative designs to reduce fatigue loads and improve reliability of multi-MW turbines
CPdemonstration
2012-2
2.5: CONCENTRATED SOLAR POWER
ENERGY.2012.2.5.1: Research, development and testing of solar dish systems CP 2012-1
ENERGY.2012.2.5.2: Hybridisation of CSP with other energy sources CP 2012-1
2.6: OCEAN Energy.2012.2.6-1: Demonstration and deployment of first ocean energy farmsCP
demonstration2012-2
.2.9: CROSS-CUTTING ISSUES ENERGY.2012.2.9.1: Power generation in the low temperature range CP 2012-1
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY.3: RENEWABLE FUEL PRODUCTION
3.2: SECOND GENERATION FUEL FROM BIOMASS
ENERGY.2012.3.2.1: Biofuels from microalgae or macroalgae CP 2012-1
ENERGY.2012.3.2.2: Development and testing of advanced sustainable bio-based fuels for air transport
CP 2012-1
Energy.2012.3.2.3: Pre-commercial industrial scale demonstration plant on lignocellulosic ethanol
CPdemonstration
2012-2
3.7: CROSS-CUTTING ISSUESENERGY.2012.3.7.1: Development of new or improved logistics for lignocellulosic biomass harvesting, storage and transport
CPsmall & medium
size2012-1
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY.4: RENEWABLES FOR HEATING AND COOLING
4.1: LOW/MEDIUM TEMPERATURE SOLAR THERMAL ENERGY
ENERGY.2012.4.1.1: Research and development for medium temperature range solar collectors (100°-250°C)
CP 2012-1
ACTIVITY ENERGY.5: CO2 CAPTURE AND STORAGE TECHNOLOGIES FOR ZERO EMISSION POWER GENERATION
5.2: CO2 STORAGE
ENERGY.2012.5.2.1: Sizeable pilot tests for CO2 geological storageCP
Funding from third parties
2012-1
ENERGY.2012.5.2.2: Impact of the quality of CO2 on transport and storage behaviour
CP 2012-1
ACTIVITY ENERGY.5&6: CROSS-CUTTING ACTIONS BETWEEN ACTIVITIES ENERGY.5 AND ENERGY.6
5&6.2: CROSS CUTTING AND REGULATORY ISSUES
Energy.2012.5&6.1-1 Pilot plant-scale demonstration of advanced post-combustion CO2 capture processes with a view to integration in fossil fuel power plants
CPdemonstration
2012-2
Energy.2012.5&6.1-2: Pilot plant-scale demonstration and integration of emerging and new combustion technologies
CPdemonstration
2012-2
ENERGY.2012.5&6.2.1: Support to the coordination of stakeholders' activities in the field of Zero Emission Energy Production
CSA-SA 2012-1
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY 7: SMART ENERGY NETWORKS
7.1: DEVELOPMENT OF INTER-ACTIVE DISTRIBUTION ENERGY NETWORKS
ENERGY.2012.7.1.1: Integration of variable distributed resources in distribution networks
CP 2012-1
ENERGY.2012.7.1.2: Enhancing electricity networks through use of distributed intelligence
CP 2012-1
ENERGY.2012.7.1.3: Empowering smart customers to participate in active demand and energy system efficiency
CP 2012-1
7.2: PAN-EUROPEAN ENERGY NETWORKS
ENERGY.2012.7.2.1: Planning for European Electricity Highways to ensure the reliable delivery of renewable electricity and market integration
CP 2012-x
7.3: CROSS CUTTING ISSUES AND TECHNOLOGIES
ENERGY.2012.7.3.1: Networking of national R&D and demonstration projects on smart metering infrastructure and data processing
CSA-CA 2012-1
ENERGY.2012.7.3.2: Facilitating the deployment of safe stationary batteries CP 2012-1
ENERGY.2012.7.3.3: Support to the coordination of stakeholders activities in the field of Smart Grids
CSA-SA 2012-1
Nationale Kontaktstelle Energie: [email protected]
Calls ENERGY-2012
Call identifier Title Released Deadline Budget Evaluation
FP7-ENERGY-2012-1 ENERGY CALL PART 1 19.07.2011 25.10.2011 150 Two-step
FP7-ENERGY-2012-2 ENERGY CALL PART 2 XX.07.2011 08.03.2012 81 Single step
FP7-ENERGY-SMARTCITIES-2012
Smart Cities And Communities XX.07.2011 01.12.2011 40 Singel step
FP7-ERANET-2012-RTD
ERA-NET PLUS - BIOENERGY DEMONSTRATIONS OF THE EUROPEAN INDUSTRIAL BIOENERGY INITIATIVE
10
FP7-2012-NMP-ENV-ENERGY-ICT-EeB
DEMONSTRATION OF ZERO CARBON BUILDING RENOVATION FOR CITIES AND DISTRICTS
35
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY.2: RENEWABLE ELECTRICITY GENERATION
2.1: PHOTOVOLTAICS
ENERGY 2012.1.1: Reliable, cost-effective, highly performing PV systems CP 2012-1
Energy.2012.2.1-2: Demonstration of multifunctional PV modules CP
demonstration2012-2
2.3: WIND
ENERGY.2012.2.3.1: Innovative wind conversion systems (10-20MW) for offshore applications
CP 2012-1
Energy.2012.2.3-2: Demonstration of innovative designs to reduce fatigue loads and improve reliability of multi-MW turbines
CPdemonstration
2012-2
2.5: CONCENTRATED SOLAR POWER
ENERGY.2012.2.5.1: Research, development and testing of solar dish systems CP 2012-1
ENERGY.2012.2.5.2: Hybridisation of CSP with other energy sources CP 2012-1
2.6: OCEAN Energy.2012.2.6-1: Demonstration and deployment of first ocean energy farmsCP
demonstration2012-2
.2.9: CROSS-CUTTING ISSUES ENERGY.2012.2.9.1: Power generation in the low temperature range CP 2012-1
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY.3: RENEWABLE FUEL PRODUCTION
3.2: SECOND GENERATION FUEL FROM BIOMASS
ENERGY.2012.3.2.1: Biofuels from microalgae or macroalgae CP 2012-1
ENERGY.2012.3.2.2: Development and testing of advanced sustainable bio-based fuels for air transport
CP 2012-1
Energy.2012.3.2.3: Pre-commercial industrial scale demonstration plant on lignocellulosic ethanol
CPdemonstration
2012-2
3.7: CROSS-CUTTING ISSUESENERGY.2012.3.7.1: Development of new or improved logistics for lignocellulosic biomass harvesting, storage and transport
CPsmall & medium
size2012-1
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY.4: RENEWABLES FOR HEATING AND COOLING
4.1: LOW/MEDIUM TEMPERATURE SOLAR THERMAL ENERGY
ENERGY.2012.4.1.1: Research and development for medium temperature range solar collectors (100°-250°C)
CP 2012-1
ACTIVITY ENERGY.5: CO2 CAPTURE AND STORAGE TECHNOLOGIES FOR ZERO EMISSION POWER GENERATION
5.2: CO2 STORAGE
ENERGY.2012.5.2.1: Sizeable pilot tests for CO2 geological storageCP
Funding from third parties
2012-1
ENERGY.2012.5.2.2: Impact of the quality of CO2 on transport and storage behaviour
CP 2012-1
ACTIVITY ENERGY.5&6: CROSS-CUTTING ACTIONS BETWEEN ACTIVITIES ENERGY.5 AND ENERGY.6
5&6.2: CROSS CUTTING AND REGULATORY ISSUES
Energy.2012.5&6.1-1 Pilot plant-scale demonstration of advanced post-combustion CO2 capture processes with a view to integration in fossil fuel power plants
CPdemonstration
2012-2
Energy.2012.5&6.1-2: Pilot plant-scale demonstration and integration of emerging and new combustion technologies
CPdemonstration
2012-2
ENERGY.2012.5&6.2.1: Support to the coordination of stakeholders' activities in the field of Zero Emission Energy Production
CSA-SA 2012-1
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY.7: SMART ENERGY NETWORKS
7.1: DEVELOPMENT OF INTER-ACTIVE DISTRIBUTION ENERGY NETWORKS
ENERGY.2012.7.1.1: Integration of variable distributed resources in distribution networks
CP 2012-1
ENERGY.2012.7.1.2: Enhancing electricity networks through use of distributed intelligence
CP 2012-1
ENERGY.2012.7.1.3: Empowering smart customers to participate in active demand and energy system efficiency
CP 2012-1
7.2: PAN-EUROPEAN ENERGY NETWORKS
ENERGY.2012.7.2.1: Planning for European Electricity Highways to ensure the reliable delivery of renewable electricity and market integration
CP 2012-x
7.3: CROSS CUTTING ISSUES AND TECHNOLOGIES
ENERGY.2012.7.3.1: Networking of national R&D and demonstration projects on smart metering infrastructure and data processing
CSA-CA 2012-1
ENERGY.2012.7.3.2: Facilitating the deployment of safe stationary batteries CP 2012-1
ENERGY.2012.7.3.3: Support to the coordination of stakeholders activities in the field of Smart Grids
CSA-SA 2012-1
Area Topic Type FP7-ENERGY-
ACTIVITY ENERGY 8: ENERGY EFFICIENCY AND SAVINGS
8.1: EFFICIENT ENERGY USE IN THE MANUFACTURING INDUSTRY AND BUILDING SECTOR
ENERGY.2012.8.1.1: Next generation heat pump technologies CP 2012-1
8.8: SMART CITIES AND COMMUNITIES
Energy.2012.8.8-1: Strategic sustainable planning and screening of city plans – Smart Cities and Communities Incubator
CSA-CASMARTCITIES-2012
Energy.2012.8.1-2: Large scale systems for urban area heating and/or cooling supply
CPdemonstration
SMARTCITIES-2012
Energy.2012.8.1.3: Demonstration of Zero Carbon Building Renovation for cities and districts
CPdemonstration
FP7-2012-ENV-ICT-ENERGY-NMP-EeB
ACTIVITY ENERGY.10: HORIZONTAL PROGRAMME ACTIONS
10.1: ERA-NET PLUS ON BIOENERGY
Energy.2012.10.1.1 : ERA-NET Plus - Bioenergy Demonstrations of the European Industrial Bioenergy Initiative
CSAcoordinating
research activities
FP7-ERANET-2012-RTD
10.2: FUTURE EMERGING TECHNOLOGIES
ENERGY.2012.10.2.1: Future Emerging Technologies CP 2012-1
› Factories of the Future — FoFFP7 - Budget: 645 M€FP7-Theme: NMP, ICT
› Energy Effcient Buildings — E2B FP7 - Budget: 505 M€FP7-Theme: NMP, ICT, Energy, Environment
› Green Cars — GC FP7 - Budget: 503 M€FP7-Theme: SST, ICT, NMP, Environment, Energy
› FCH JTI – Art188, administered by FCH JU
PPPs in 7th Framework Programme
Partner search engines
› Partner Search CORDIS› http://cordis.europa.eu/partners
› Managenergy› http://www.managenergy.net/partner_search
› Ideal-IST › http://www.ideal-ist.net/partner-search
› ICT-PSP › http://ec.europa.eu/information_society/activities/ict_psp/cf/partner/login/
index.cfm
› IGLO› http://www.iglortd.org/services/partner.html
› SMEs
› http://www.ncp-sme.net/partner-search
› www.enterprise-europe-network.ec.europa.eu/services/technology-transfer
Strukturr and Budget of FCH JU
Public share: 450 Mill. €
Private share: in-kind
Should match each other
Governing Board: IG, RG, COM
Kommission 5 Sitze; Forschungsgruppe 1 Sitz
Nationale Kontaktstelle Energie: [email protected]
16
Preliminary Structure of the MAIP
Budget and cost sharing of the FuelCells and Hydrogen JU
› For 2008 – 2013: € 940 M (minimum)
› EC budget : € 470 M (in cash)
› Industry : € 450 M (minimum in kind), € 20 M (in cash)
› Close follow-up to monitor and ensure the 50/50 cost sharing between the Community and industry
Financing
Direct Costs
Indirect costs: 20% of direct costs
Nationale Kontaktstelle Energie: [email protected]
Type of Organisation Type of Activity CP= coordinated projects; CSA= coordination / support action
RTD Demonstration Other
Industry (other than SME)
CP: < 50%CSA:< 100%
CP: < 50% CSA: < 100%
CP: < 100% CSA: < 100%SME
CP: < 75% CSA:< 100%Non-profit
(public, research, …)
Der Projektträger Jülich. Partner für Forschungsmanagement
CALL FCH JU 2011-1
› published 3. Mai 2011› Deadline 18. August 2011› Budget 109 Millionen EUR› 36 Topics› Info: www.fch-ju.eu
European Network of Energy-NCPs
› 3 years EU-Project C-ENERGY+› www.c-energyplus.eu
› Contacts› Brokerage Events› Partner Search (no dedicated engine)› Russian partner
Elena Chistyakova, [email protected]
http://www.fp7-energy.ru
Piotr Świątek
NCP Energy
Project Management Jülich
Research Centre Jülich
D-52425 Jülich
+49 2461 61 1848 office
+49 170 211 96 12 mobile/cell
www.nks-energie.de