web view6/16/15 76 tuckaway lane: replaced sewer pump. 6/25/15 whitney avenue & vaughn street....

6
2015 TOWN OF TRYON WASTEWATER COLLECTION SYSTEM ANNUAL PERFORMANCE REPORT I. General Information Facility System Name: Town of Tryon Responsible Entity: Tryon Wastewater Treatment Plant Person in Charge: Wastewater Plant ORC – Deborah Bradley (828) 859-5626 Collection System ORC – Andrew McCallister (828) 859-5626 Applicable Permits: Wastewater Plant NPDES Permit No. NC0021601 Collection System NPDES Permit No. WQCS00111 Description of treatment process: Tryon Wastewater Plant is a Class 3 facility with the capacity of treating 1.5 MGD with the following components: Primary screening Automatic bar screen Parshall Flume Extended aeration Secondary clarification Chlorine disinfection Dechlorination Settling Tank The Facility is located at 1526 East Howard Street, east of Tryon in Polk County. The Town of Tryon is authorized to discharge wastewater from said facility to receiving waters designated as Vaughn Creek in the Broad River Basin in accordance with effluent limitations and monitoring requirements. II. Plant Performance Permit Limit Violations: None Monitoring Violations: None

Upload: phamdien

Post on 01-Feb-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Web view6/16/15 76 Tuckaway Lane: Replaced sewer pump. 6/25/15 Whitney Avenue & Vaughn Street. 6”blockage- jet rodded 200 ft, cleaned 2800 ft right-of-way

2015TOWN OF TRYON

WASTEWATER COLLECTION SYSTEMANNUAL PERFORMANCE REPORT

I. General InformationFacility System Name: Town of TryonResponsible Entity: Tryon Wastewater Treatment PlantPerson in Charge: Wastewater Plant ORC – Deborah Bradley (828) 859-5626

Collection System ORC – Andrew McCallister (828) 859-5626Applicable Permits: Wastewater Plant NPDES Permit No. NC0021601

Collection System NPDES Permit No. WQCS00111

Description of treatment process: Tryon Wastewater Plant is a Class 3 facility with the capacity of treating 1.5 MGD with the following components:

Primary screening Automatic bar screen Parshall Flume Extended aeration Secondary clarification Chlorine disinfection Dechlorination Settling Tank

The Facility is located at 1526 East Howard Street, east of Tryon in Polk County.

The Town of Tryon is authorized to discharge wastewater from said facility to receiving waters designated as Vaughn Creek in the Broad River Basin in accordance with effluent limitations and monitoring requirements.

II. Plant PerformancePermit Limit Violations: NoneMonitoring Violations: NoneReporting Violations: None

To the best of my knowledge there were no environmental impacts due to plant operations or operator error.

Page 2: Web view6/16/15 76 Tuckaway Lane: Replaced sewer pump. 6/25/15 Whitney Avenue & Vaughn Street. 6”blockage- jet rodded 200 ft, cleaned 2800 ft right-of-way

III. Collection System Performance

The Town of Tryon had no sanitary sewer overflows for 2015.

The following were performed by the water and sewer maintenance crew:

1/6/15 TJ Restaurant: Jet rodded 500 ft. of sewer line 1/20/15 77 Jervey Road: jet rodded 400 ft. of sewer line. 2/1/15 Galaxy Circle: jet rodded 200 ft. of sewer line 2/3/15 547 Lockhart Rd: jet rodded 75 ft. of sewer line 2/5/15 Depot St: Jet rodded 250 ft. of sewer line 2/5/15 265 McDowell St: jet rodded 175 ft. of sewer line 2/7/15 Carolina Drive: jet rodded 400 ft. of sewer line 2/9/15 Harmon Field Manhole: jet rodded 120 ft. sewer line 2/23/15 Peak St: jet rodded 200 ft. of sewer line 2/27/15 Thousand Pines Lane: jet rodded 40 ft. of sewer line 3/4/15 855 Carolina Drive: jet rodded 200 ft. of sewer line 3/6/15 165 Galax Circle: jet rodded 150 ft. of sewer line 3/19/15 Depot Street: jet rodded 100 ft.of sewer line 3/19/15 50 Carolina Drive: jet rodded 150 ft. of sewer line 3/31/15 Woodland Park:, Jet Rodded 75 ft. 4/1/15 36 Payne St:: jet rodded 30ft. of sewer line 4/6/15 Mowed right-of-way from CYP basin to creek crossing 4/13/15 140 Second Street: jet rodded 125 ft. of sewer line 4/15/15 Tryon Point Family Dentist: 4” Blockage- jet rodded 50 ft. 4/17/15 Woodland Park at IGA: Replaced 200 ft. clay with 6” PVC 4/17/15 Woodland Park and IGA: Replaced 200 ft 6” sewer line 4/21/15 Replace 30 ft. 4” service Woodland Park at IGA 4/21/15 Woodland Park: Tied in new 4” service line 4/23/15 Sewer Blockage Hwy 108 at Mill Pond: Jet Rodded 205 ft 4/24/15 76 Whitney Avenue: 4” service blockage 4/24/15 75 Whitney Ave: Blockage- jet rodded 140 ft. sewer line 4/24/15 Highway 108 Mill Pond: jet rodded and cleaned 400 ft both directions. Total 800 ft. 4/30/15 Tryon Elementary School: Blockage, replace 25 ft. bad clay line with PVC 4/30/15 School Street-Tryon Elementary School: Replaced 50 ft 6” sewer line 5/5/15 636 Trade Street: jet rodded 280 ft. of sewer line 5/15/15 Tryon Pointe Dentistry: 4” service blockage. 6/12/18 Windstream Building: 4” service blockage- jet rodded 120 ft. 6/16/15 76 Tuckaway Lane: Replaced sewer pump 6/25/15 Whitney Avenue & Vaughn Street. 6”blockage- jet rodded 200 ft, cleaned 2800 ft right-

of-way 7/5/15 376 Markham Rd: 4” service blockage at manhole 7/8/15 Mowed 2800 ft. of sewer right-of-way 7/20/15 Side Street Pizza: Grease problem in manhole 7/22/15 Whitney Ave Extension: Wall residence – sewer blockage 7/27/15 40 Whitney Avenue: 4” service sewer blockage 7/31/15 White Oak Nursing Home: sewer blockage/gloves and wash rags

Page 3: Web view6/16/15 76 Tuckaway Lane: Replaced sewer pump. 6/25/15 Whitney Avenue & Vaughn Street. 6”blockage- jet rodded 200 ft, cleaned 2800 ft right-of-way

8/3/15 Oak Street: Replaced 20 ft. of 6” sewer at manhole 8/11/15 Hwy 176 across from IGA: 4” service blockage 9/6/15 Tyler Philphot 4: service blockage 10/22/15 Oak Street : White Oak Nursing Home/blockage with rags and gloves 11/4/15 Markham Road: 4” blockage service line 11/9/15 Lyle Street: Blockage under house 11/14/15 Country Club Rd. Wolfe residence: sewer blockage 11/17/15 51 Embury Street: sewer blockage service line 12/10/15 Broadway Ave: Scoggins residence: Sewer blockage 12/15/15 McCowan’s residence: sewer blockage 12/18/15 Pacolet Hills Church: Hwy 176 sewer blockage 12/22/15 740 E. Howard St: Broken line at house

11,110 feet of sewer Lines cleaned and replaced.

IV. Notification

This report has been made available by advertising on the Town of Tryon’s web site www.tryon-nc.com or a copy may be picked up at the Tryon Town Hall Monday thru Friday between 8:30 a.m.-5:00 p.m.

V. CertificationI certify under the penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the public.

_______________________________ _______________________Deborah Bradley, Operator in Responsible Charge DateTryon Wastewater Treatment Plant

_______________________________ _______________________Andrew McCallister, Operator in Responsible Charge DateTryon Wastewater Collection System

__________________________________________ ________________________________Gary Walker, Director of Public Works DateTown of Tryon

Page 4: Web view6/16/15 76 Tuckaway Lane: Replaced sewer pump. 6/25/15 Whitney Avenue & Vaughn Street. 6”blockage- jet rodded 200 ft, cleaned 2800 ft right-of-way
Page 5: Web view6/16/15 76 Tuckaway Lane: Replaced sewer pump. 6/25/15 Whitney Avenue & Vaughn Street. 6”blockage- jet rodded 200 ft, cleaned 2800 ft right-of-way

2015

Town of Tryon

Wastewater Collection System

Annual Performance ReportHouse Bill 1160, Clean Water Act 1999