Learn about LEED-EB OMfrom a local Austin project.
© copyright 2012 CloudForest Software LLCCONSULTING & SOFTWARE
Objectives for this presentation:
1.What is LEED-EBOM? How does it differ from other LEED rating systems?2.How does a building owner or manager budget for & begin LEED-EBOM? 3.What are the most difficult and costly parts of the EBOM process?4.What are the benefits of LEED-EBOM to you and your tenants?5.What tasks are required of a building manager for LEED-EBOM?
© copyright 2012 CloudForest Software LLCCONSULTING & SOFTWARE
Case Study:Hartland Plaza1717 W. 6th St.
•181,000 sf (not including satellite building/garage)•Prime location with decent opportunity for walk/bike commute to nearby residential areas•Easy in-out to Mopac provides great opportunity for carpooling•About 50 tenants companies, many green•Roughly 500 occupants
© copyright 2012 CloudForest Software LLCCONSULTING & SOFTWARE
Case Study:Hartland Plaza1717 W. 6th St.
•181,000 sf •Built in 80’s•Some mechanical systems upgraded since then•Lighting upgraded since then•Nice design for daylighting– stepped façade with distributed windows, oriented east but with a shaded courtyard
© copyright 2012 CloudForest Software LLCCONSULTING & SOFTWARE
1. What is LEED-EBOM? How does it differ from other LEED rating systems?• For Existing Buildings
• Focus on Operations and Maintenance instead of the physical design of the building
• Requires recertification every 5 years
• Lots of walk-throughs
• Lots of occupant surveys and informal meetings with occupants and building personnel
• Lower level certification can be accomplished without engineers
© copyright 2012 CloudForest Software LLCCONSULTING & SOFTWARE
2. How does a building owner or manager budget for & begin LEED-EBOM?
• review the checklist and pick the easiest credits to get to your goal rating level
• look out for high dollar items• Commissioning• Mechanical retrofits (plumbing & irrigation
retrofits are ok)• Materials credits, if you have many different
tenants
• be realistic about items needing tenant participation• Green purchasing • Alternative transportation commuting
© copyright 2012 CloudForest Software LLCCONSULTING & SOFTWARE
3. What are the most difficult and costly parts of the EBOM process?
Besides those mentioned on the previous slide:
•Difficult• Calculations such as Minimum Indoor Air
Quality Performance (CFM fresh air)
•Time consuming• Walk-throughs such as daylighting• Tenant participation- Alternative
Transportation, Purchasing
•Costly• Green tenant renovations: construction waste
recycling and construction IAQ
© copyright 2012 CloudForest Software LLCCONSULTING & SOFTWARE
4. What are the benefits of LEED-EBOM to you and your tenants? • Can reveal opportunities to serve tenants better.
There is so much interviewing, auditing, and surveying that you end up hearing things you otherwise might not.
• Can reveal operating cost saving opportunities
• Can provide tenants a structured forum for communicating needs and wants.
• greener, healthier space = higher rents or higher employee productivity
• green marketing
© copyright 2012 CloudForest Software LLCCONSULTING & SOFTWARE
5. What tasks are required of a building manager for LEED-EBOM?
• Hire or designate a LEED coordinator/consultant• Feasibility assessment (including cost)• Create and track point strategy• Calculations• Draft surveys and policies• Walk-throughs, audits• Meet with tenants and building personnel to
increase participation and collect data, surveys, documentation
• Watch the performance period timeline
• Assist LEED coordinator with all of the above, especially feasibility assessment
© copyright 2012 CloudForest Software LLCCONSULTING & SOFTWARE
5. What tasks are required of a building manager for LEED-EBOM? • Assist LEED coordinator with all of the above
• Pay for upgrades & retrofits
• Administer occupant surveys – and provide incentives for completion
• Provide effective incentives for •alternative transportation commuting•green purchasing•recycling
• Effectively communicate the benefits to occupants and engage them enthusiastically
© copyright 2012 CloudForest Software LLCCONSULTING & SOFTWARE
Building performance simplified.
Fast, simple online tool that models financial, energy & environmental performance all in one model, including a huge menu of green/LEED upgrades.
cloudforestsoftware.com
We’re the ones who automated it. We’re also available to guide you through your building project in-person.
cloudforestconsulting.com
Direct contact: Aide Fitch cell: 512-619-0983