Page 1: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

鼎實集團DYNACIATE GROUP OF COMPANIES

Page 2: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

COMPANY BACKGROUND

Page 3: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

VISION AND MISSION

VISION:• To be an industry leading ‘EPC (Engineering, Procurement, and Construction)’ solution provider.

MISSION:• To provide our customers with the highest quality of engineering services, at the most competitive price

structure while dedicating ourselves to On Time Delivery and be Safety & Environmentally responsible.

• To be the ‘supplier of choice’ in specific market sectors for products and services. With our range of comprehensive and competitive priced products and services, we will deliver ‘true value’ to all our customers. Our mission is to ensure our unwavering dedication to maintaining our long term relationships with our customers, vendors and, for the job satisfaction & welfare of our employees.

• To develop an effective management concept with core drivers for productivity, continuous development and growth of the company, and instilling high work ethics for all personnel.

Page 4: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

GROUP STRUCTURE

Dynaciate (Kuantan) Sdn Bhd

East Coast Region Project and Servicing Contract.

DYNACIATE GROUP OF COMPANIES

Dynaciate Engineering Sdn Bhd

Plant, Process Engineering and Construction.

Dyna Elite Construction Sdn Bhd

Civil and Structural Construction Work, Road work, Drainage and etc.

Dyna Teknik Sdn Bhd

Servicing Contract, Maintenance Work and Facilities Management.

OG Tech Resources Sdn Bhd

Staging and Scaffolding (rental and erection).

Dynaciate (S) Pte Ltd

Sales and Service Office.

Dynaciate Fabricators Sdn Bhd

Pressure Vessel, Tankage, Steel Structure and Customize Steel Fabrication.

Page 5: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

OUR PEOPLE

Permanent Staff : 160 paxs.

Contract Staff : 120 paxs. Approx. (as of February 2016)

Page 6: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

MANAGEMENT TEAM

Page 7: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

OFFICE ENVIRONMENT

Page 8: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

FACTORY PASIR GUDANG, JOHOR

LAND AREA : 9 Acres BUILT-UP AREA : 14,000 m2

Page 9: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

FACTORY GEBENG, KUANTAN

DYNACIATE (KUANTAN) SDN. BHD.

Address : Lot 136a, Jalan Gebeng 2/6,Kawasan Perindustrian Gebeng,26080, Kuantan,Pahang.

LAND AREA : 3.5 Acres

BUILT-UP AREA : 4,000 m2

Page 10: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

FABRICATION WORKSHOP

Page 11: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

MACHINERY & EQUIPMENT

• CNC Machine• Rolling Machine• Drilling Machine• Bending Machine• Welding Machine (>200 nos)• Lathe Machine• Auto & Manual Cutting

Machines• Forklift• Skylift• Boomlift• Lorry Crane• Hydrotest Equipment

Page 12: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

REGISTRATION AND LICENCES

• CIDB (Grade 7)

• Kementerian Kewangan Malaysia

• Manufacturing Licence

• Felda Holding Berhad

• Licensed Manufacturing

Warehouse

• Singapore bizSAFE

Level 3

Page 13: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

QUALITY, OCCUPATIONAL SAFETY & HEALTH ACHIEVEMENT

• ISO 9001:2008 - Certified by BM Trada Certification Ltd on 20th July 2011

• OHSAS 18001:2007 - Certified by BM Trada Certification Ltd on 13th March 2013

Page 14: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

CERTIFICATION OF AUTORIZATION OF BOILER & PRESSURE VESSEL

• Authorized manufacturer and repairer of pressure vessel by ASME

• Authorized repairer of pressure vessel by NBBI

• JKKP (DOSH) approved unfired pressure vessel manufacturer

• JKKP (DOSH) approved gas piping contractor

Page 15: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

TESTIMONIAL

• IOI Lipid Enzymtec Project

• Foster Wheeler

• Synthomer & Foster Wheeler (Safety Award)

• Mitsubishi Kakoki Kaisha, Ltd

• Tsukishima Engineering (M) Sdn Bhd

• Kimura Chemical Plants Co. ,Ltd

Page 16: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

CORE BUSINESS

Products & Services

Factory Projects MRO

Customize

Engineering Steel

Fabrication

Skid Fabrication

Reel Fabrication

Pipe Spooling

Steel Structural

Tankage Fabrication

Pressure Vessel

EPCC Services

Turnkey

Construction

Mechanical,

Equipment & Piping

Installation

Plant Construction

Facilities

Management

Plant Service &

Maintenance

Industrial Piping

System

Page 17: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

OUR CUSTOMER

Page 18: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

PROJECT REFERENCENO PROJECT REFERENCE CUSTOMER YEAR

1 Supply and Fabricate Steel Reel. Kiswire Continuous

2 Plant Upgrade and Modification. Kaneka 2010

3 Fabrication & Installation for Roofing Framing (Giant – Miri) Bluescope 2010

4 Civil Building and Foundation Work (LGT2) TLPJ 2011

5 Building Expansion for Ibiden @ Pulau Pinang Bluescope 2012

6 Customize Steel Fabrication Technip Continuous

7 Mechanical Works (Piping Fabrication & Equipment Installation) Synthomer 2012

8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012

9 MP-2 Project – Main Mechanical Work (Piping , Equipment Installation, Painting & Insulation) MKK 2012

10 KAM Project – CPM Building Modification Kaneka 2012

11 Mechanical Works (Piping Fabrication & Equipment Installation) Synthomer 2013

12 S5 Project - Turnkey (Design and Built) Desmet 2013

13 Process Piping, Equipment Installation, Insulation and Painting KCPC 2013

14 Repairing Works for EPS Warehouse at BASF Pasir Gudang Site BASF 2013

15 AFA-1 Project-Main Mechanical Work TSK 2014

16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014

17 MG1 Project - Mechanical Works (Piping Fabrication & Equipment Installation) SCEM 2014

18 JEL - BLNG Cogen II Project (Steel Structure Fabrication) JEL 2014

19 Process Piping , Pipe Rack , Equipment and Platform Fabrication and Installation Hershey 2014

20 Muhibbah-Lemongrass K007 Project Muhibbah 2014

21 KCPC-Rikevita D6 Project (Piping, Painting & Installation Work) KCPC 2015

22 MMC-PCP-Labour Camp Facilities Work Package MMC 2015

23 JEL- Berakas Power Station Power Augumentation Project - Brunei JEL 2015

24 Toyo-Temporary Construction Facilities TOYO 2015

25 Toyo-Camp Design and Construction TOYO 2015

26 Emerson-Skid Fabrication (E&I Work)-Petronas Carigali TGAST Project Emerson 2015

27 Toyo-Underground Cooling Water TOYO 2015

28 Pfrizer - Train 5 Piping Package Pfrizer 2015

29 FTCGM-Mechanical, Electrical, Instrumentation & Automation Works FTCGM 2015

30 TZM Project – Supply of Piping Materials, Piping works and Equipment installation works. TSK 2016

Page 19: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

DESIGN AND BUILD

Client : Toyo Engineering & Construction S/B End User : Petroliam Nasional Berhad (PETRONAS),

MalaysiaLocation : Pengerang, Johor.Year : 2015 – PresentDescription : Design , supply , Erect and Commissioning

of Labour Accommodation Camp. (12 Block)

Page 20: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

DESIGN AND BUILD (TEMPORARY CONSTRUCTION FACILITIES)

Client : Toyo Engineering & Construction S/B End User : Petroliam Nasional Berhad (PETRONAS),

MalaysiaLocation : Pengerang, Johor.Year : 2015Description : TCF - Design , supply , Erect of Temporary

Facilities Construction.

Page 21: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

DESIGN AND BUILD

Client : MMC Engineering Services Sdn Bhd.End User : Petroliam Nasional Berhad (PETRONAS),

MalaysiaLocation : Pengerang, Johor Year : 2015 – PresentDescription : Design , supply , Erect and Commissioning

of Labour Accommodation Camp. (9Block)

Page 22: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

TURNKEY CONSTRUCTION

Client : Desmet Ballestra s.p.a.End User : Emery Oleochemicals (M) Sdn BhdPM : Foster Wheeler E&C (M) Sdn BhdLocation : Banting, KlangYear : 2013 – 2014Description : Engineering , Procurement, Construction

and Commissioning The Additional Facilities for The Sulphonation Plant for Emery Oleochemicals(M) Sdn Bhd at Telok Panglima Garang, Kuala Langsat, Selangor, Malaysia.

Page 23: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

MECHANICAL, EQUIPMENT AND PROCESS PIPING WORK

Client : Tsukishima Engineering Malaysia Sdn Bhd.

End User : Tosoh Advanced Materials Sdn Bhd.

Location : Kemaman, Terengganu

Year : 2016 - Present

Description : Process Piping, Equipment Installation,

and Painting Works.

Page 24: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

MECHANICAL, EQUIPMENT AND PROCESS PIPING WORK

Client : Hershey Malaysia Sdn Bhd

Location : Senai, Johor

Year : 2015 - Present

Description : Process Piping, Equipment platform, Equipment

Installation, Insulation and Painting Works.

Page 25: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

MECHANICAL, EQUIPMENT ANDPROCESS PIPING WORK

Client : Pfizer Asia Pacific Pte Ltd

Location : Singapore

Year : 2015 - present

Description : Supply, fabricate and install of Piping.

Page 26: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

MECHANICAL, EQUIPMENT AND PROCESS PIPING WORK

Client : Sumitomo Chemical Engineering Co., Ltd.

End User : Kaneka Innovative Fibers Sdn Bhd

Location : Gebeng, Pahang

Year : 2014 – 2015

Description : MG1 PROJECT – Process Piping, Equipment

Installation, Insulation and Painting Works.

Page 27: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

MECHANICAL, EQUIPMENT AND PROCESS PIPING WORK

Client : Tsukishima Engineering Malaysia Sdn Bhd

End User : Adeka Foods (Asia) Sdn Bhd

Location : Tanjung Langsat, Johor

Year : 2014

Description : Process Piping, Equipment Installation,

Insulation and Painting Works.

Page 28: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

MECHANICAL, EQUIPMENT, TANKAGE FABRICATION AND PROCESS PIPING WORK

Client : Kelinton Group Berhad.

End User : Pengerang Terminals Sdn. Bhd.

Location : Pengerang , Johor

Year : 2014

Description : Hot Oil System - Process Piping, Equipment Installation, Insulation and Painting Works.Design, Fabrication & Testing of Dia. 3800 mm Sump Tank and Dia. 2400 mm Expansion Tank.

Page 29: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

Cooling Tower

Pipe Rack

Client : Mitsubishi Kakoki Kaisha LtdEnd User : Polyplastic Asia Pasific Sdn BhdLocation : Gebeng, PahangYear : 2012 - 2013Description : Process Piping, Equipment Installation, Insulation and Painting Works.

MITSUBISHI KAKOKI KAISHA, LTD.

DO/TOX Plant POL/NPP Plant

Process Tank

F Unit

MECHANICAL, EQUIPMENT ANDPROCESS PIPING WORK

Page 30: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

MECHANICAL, EQUIPMENT AND PROCESS PIPING WORK

Client : Kimura Chemical Plants Co., Ltd.End User : Rikevita (M) Sdn BhdLocation : Tampoi, JohorYear : 2015Description : D6 - Process Piping, Equipment Installation, Insulation,

Scaffolding and Painting Works.

Page 31: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

Client : Kimura Chemical Plants Co., Ltd.End User : Rikevita (M) Sdn BhdLocation : Tampoi, JohorYear : 2013Description : D5 - Process Piping, Equipment Installation, Insulation and

Painting Works.

MECHANICAL, EQUIPMENT AND PROCESS PIPING WORK

Page 32: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

Client : Synthomer Malaysia Sdn Bhd

Location : Pasir Gudang, Johor

Year : 2013

Description : Job 3 - Mechanical, Equipment and Process Piping

Work.

MECHANICAL, EQUIPMENT AND PROCESS PIPING WORK

Page 33: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

MECHANICAL, EQUIPMENT AND PROCESS PIPING WORK

Client : Synthomer Malaysia Sdn Bhd

PM : Foster Wheeler E&C (M) Sdn Bhd

Location : Pasir Gudang, Johor

Year : 2009 - 2012

Description : Job 1 and 2 - Mechanical, Equipment and Process Piping Work.

Page 34: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

Client : IOI Lipid Enzymtec Sdn Bhd

Location : Pasir Gudang, Johor

Year : 2009

Description : Mechanical, Equipment and Process Piping Work.

MECHANICAL, EQUIPMENT AND PROCESS PIPING WORK

Page 35: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

MECHANICAL, EQUIPMENT AND PROCESS PIPING WORK

Client : Cray Valley Resins (M) Sdn Bhd

Location : Pasir Gudang, Johor

Year : 2002

Description : Supply and Install Carbon Steel & Stainless Steel 304 Pipe.

Page 36: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

MECHANICAL, ELECTRICAL, INSTRUMENTATION AND AUTOMATION WORK

Client : Fastrack Project Pte. Ltd.

End User : DDW Colours Sdn. Bhd.

Location : Tanjung Langsat, Johor

Year : 2016 - Present

Description : Red Plant Project - ProcessMechanical, Electrical, Instrumentation and Automation.

Page 37: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

CIVIL CONSTRUCTION

Client : Toyo Engineering & Construction S/B End User : Petroliam Nasional Berhad (PETRONAS),

MalaysiaLocation : Pengerang, Johor.Year : 2016 - PresentDescription : Punj Lloyd-Tank Pad Foundation.

Page 38: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

CIVIL CONSTRUCTION

Client : Desmet Ballestra s.p.a.

End User : Emery Oleochemicals (M) Sdn Bhd

PM : Foster Wheeler E&C (M) Sdn Bhd

Location : Banting, Klang

Year : 2013 – 2014

Description : Foundation, Bridges and Building Construction Work.

Page 39: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

Client : Kaneka (Malaysia) Sdn Bhd

Location : Kuantan, Pahang

Year : 2012

Description : CPM Building Extention.

CIVIL CONSTRUCTION

Page 40: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

UNDERGROUND PIPING

Client : Toyo Engineering & Construction S/B End User : Petroliam Nasional Berhad (PETRONAS),

MalaysiaLocation : Pengerang, Johor.Year : 2015 – PresentDescription : Toyo – Underground Cooling Water Line.

Page 41: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

INDUSTRIAL & PROCESS PIPING

Client : Tanjung Bin Power Plant

Location : Pontian, Johor

Year : 2011

Description : Supply & Install FRP Pipe including Pipe Support. (1”-48”)

Client : Seagate International (Johor) Sdn Bhd

Location : Senai, Johor

Year : 2008

Description : PHPP & PVC Piping Distribution System at “Cleaning Room” & Machine Hook-up Fabrication & Installation of Stainless Steel Grating.

Page 42: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

EQUIPMENT & MACHINERY INSTALLATION

Page 43: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

EQUIPMENT & MACHINERY INSTALLATION

Page 44: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

Client : NOV Fiber Glass System

Location : Senai, Johor

Year : 2012 – Present

Description : Equipment and Machine Installation.

EQUIPMENT & MACHINERY INSTALLATION

Page 45: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

Client : Kaneka Apical (M) Sdn Bhd

Location : Kuantan, Pahang

Year : 2014

Description : Design, Fabrication, Inspect & Install of 10000 x 3350 mm SS304 Dimethyl formamide Acid Tank.

TANKAGE FABRICATION & INSTALLATION

Client : Mitsubishi Kakoki Kaisha, Ltd.

End User : Kaneka Innovative Fibers Sdn Bhd.

Location : Gebeng, Kuantan

Year : 2016

Description : MSM Project - Cone Roof Storage Tank. (7 Units) Diameter

MITSUBISHI KAKOKI KAISHA, LTD.

Page 46: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

Client : Worley Parsons Pte LtdEnd User : BASF Chemical Pte LtdLocation : Jurong, SingaporeYear : 2013Description : Fabrication of Irganox Sil0.

(10,707 x 4,200 x 4,300 mm)Fabrication of Penta Silo.(16,400 x 4,000 x 4,000 mm)

TANKAGE FABRICATION & INSTALLATION

Page 47: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

TANKAGE FABRICATION & INSTALLATION

Client :Polymer Latex SdnBhd

Location : Pasir Gudang, Johor

Year : 2009

Description : Fabricate & Install SS 304 Storage Tank.

Dimension:

1) V-6112, 6,000 mm OD x 7,570 mm H

2) V-6114, 6,000 mm OD x 7570 mm H

3) V-6116, 6,000 mm OD x 7570 mm H

4) V-6113, 6,000 mm OD x 7570 mm H

5) V-0061, 8,000 mm OD x 15,400 mm H

Qty : 6 nos

Client : Degremont (M) Sdn Bhd

End User : Syarikat Air Johor

Location : Semangar Water Supply Scheme, Kota Tinggi

Description : Design, Engineering, Fabrication and Installation of Aluminium SulphateTanks c/w 6mm of Rubber Lining.

Dimension : Dia. 5.6m x Ht. 6.5m

Qty : 3 nos.

Page 48: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

FRP STORAGE TANK FABRICATION & INSTALLATION

Client : BASF (Malaysia) Sdn. Bhd.

Location : Pasir Gudang , Johor

Year : 2014

Description : Design, Fabrication, Installation & Testing of FRP Storage Tank.

Dimension : Dia. 5.5m, 4.75m & 3.3m

Page 49: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

PRESSURE VESSELHEAT EXCHANGER FABRICATION

Client : Natural Oleochemicals Sdn. Bhd.

Location : Jurong Island, Singapore

Year : 2015

Description : Fabrication of Tube Heat Exchanger – 1 unit.

Page 50: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

PRESSURE VESSEL FABRICATION

Client : Desmet Ballestra Group

End user : Bangchak Biofuel

Location : Thailand

Year : 2015

Description : Design, Materials, Fabrication,

Supply, Inspect & Test of degassing vessel. (7 pcs)

Page 51: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

PRESSURE VESSEL FABRICATION

Client : BASF (Malaysia) Sdn Bhd

Location : Pasir Gudang, Johor

Year : 2014

Description : Design, Materials, Fabrication,

Supply, Inspect & Test of degassing vessel.

Client : Kaneka Apical (M) Sdn Bhd

Location : Kuantan, Pahang

Year : 2014

Description : Design, Fabrication, Inspect &

Install of Seal Pot.

(OD 406 mm x 1,000 mm)

Page 52: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

PRESSURE VESSEL FABRICATION

Client : Coventya Malaysia Sdn Bhd

Location : Tampoi, Johor

Year : 2014

Description : Design, Fabrication & Testing of 3300 mm x 1820 mm zincate pressure vessel for caustic soda & mixture of raw material.

Page 53: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

METERING SKID

Client : Emerson Process Management Asia Pte Ltd

End User : Petronas Carigali

Location : Pasir Gudang , Johor

Year : 2015 - 2016

Description : TGAST Project Supply, Fabricate, Assembly, Testing & Commissioning.

Page 54: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

METERING SKID

Client : Yokogawa Electric International Pte Ltd

End User : Petronas Carigali Iraq

Location : Pasir Gudang, Johor

Year : 2012

Description : Supply, Fabricate, Assembly, Testing & Commissioning.

Page 55: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

CUSTOMIZE STEEL FABRICATION(Export to Brunei)

Client : JEL (Borneo) Sdn. Bhd.

Location : Brunei

Year : 2015

Description : JEL - Design and Fabrication -BLNG Cogen II Project. (600 ton)

JEL - Design and Fabrication -Berakas Power Station Power Augumentation Project. (900 ton)

Page 56: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

STEEL FABRICATION(Export to Indonesia)

Client : Tanabe Egineering

Location : Indonesia

Year : 2015

Description : Tanabe – (Piping and Ducting), Supply Material ,

Fabrication and Export to Indonesia.

Page 57: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

Client : Kiswire Sdn Bhd

Type : Design & Build Steel Reel

Year : 2007 – Present

Description : Fabrication of Steel Reel Completed with Saddle.

CUSTOMIZE STEEL FABRICATION

Page 58: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

Client : Technip AsiaFlex Products Sdn Bhd

Location : Pasir Gudang, Johor

Year : 2011 - present

Description : Design & Fabrication of Steel Reel, Sneal& Separator.

CUSTOMIZE STEEL FABRICATION

Page 59: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

CUSTOMIZE STEEL FABRICATION

Client : Lanxess Butyl Pte Ltd

Location : Jurong Island, Singapore

Type : Design & Build Steel ducting

Year : 2014

Description : Design, Fabrication and Installation of exhaustducting for Neodymium-based Performance Butadiene Rubber (Nd-PBR) plant.

Page 60: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

Client : IHI Corporation

Location : Taiwan

Year : 2014

Description : Talin Project – Fabrication of Drip Pan (24 sets) and Funnel. (36 pcs)

CUSTOMIZE STEEL FABRICATION

Page 61: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

CUSTOMIZE STEEL FABRICATION

Client : Kanken Techno Co. Ltd

End User : Kaneka Apical (M) Sdn Bhd

Type : Deodorizer Furnace & Ducting

Year : 2013

Description : Fabrication and Installation of Deodorizer System.

Page 62: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

CUSTOMIZE STEEL FABRICATION

Client : Andritz Power Sdn Bhd

End User : Bahru Stainless Steel Sdn. Bhd.

Type : Design & Build Steel Ducting

Year : 2012

Description : Fabrication and Installation of Exhaust Ducting.

Page 63: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

Client : BASF (Malaysia) Sdn Bhd

Location : Pasir Gudang, Johor.

Year : 2013 - 2014

Description : Repairing works for EPS warehouse.

PLANT UPGRADE & MODIFICATION

Page 64: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1

Client : Kaneka Engineering (M) Sdn Bhd

Location : Kuantan, Pahang

Year : 2010

Description : Civil & Structural Work.

PLANT UPGRADE & MODIFICATION

Page 65: 鼎實集團 - cdn1.npcdn.net · PDF file8 Piping Works for Petronas Flare Gas Recovery Unit Synerlitz 2012 ... 16 PBR Project-Hoods, Chutes & Ducts Works Foster Wheeler 2014 17 MG1