a0corbinphilhower.com/images/corbinphilhower_portfolio_construction... · a5.1 finish plan lower...
TRANSCRIPT
101
A101
1 Ref
1
Ref
1 Ref
1
Ref
00'-00" 1i
F-1
Room name101
1i
1A101
SIM
NORTH ARROW
ROOM TAG NAME
CEILING HEIGHT TAG
DOOR TAG
ELEVATION TARGET
SECTION TARGET
WALL TYPE TAG
SWITCH TAGS
LIGHT FICTURE TAG
1i FURNITURE TAG0 GRID BUBBLE TAG
1i CASEWORK TAG
A1011
SIM
ENLARGED PLAN TAG
EARTH HATCH
EXISITING WALLHATCH
CARPET TILE HATCH
CONCRETE HATCH
CERAMIC TILE HATCH
HARDWOOD FLOOR HATCH
HIDDEN LINE
OVERHEAD LINE
CONC-1
CAR-1 CT-1
WD-1
GYPSUM BOARD
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
11:5
7 PM
A0.0
COVER PAGE
Joclyn OatsCorbin Philhower
Issue Date22-3809
SITE LOCATION SITE MAP
1/8" = 1'-0"SYMBOLS LEGEND
1/8" = 1'-0"MATERIAL LEGEND
SHEET LIST
SHEETNUMBER SHEET NAME
A0.0 COVER PAGEA0.1 GENERAL NOTESA0.2 ACCESSIBILTY GENERAL NOTESA0.3 SCHEDULESA1.1 STRUCTURAL PLAN LOWER LEVELA1.2 STRUCTURAL PLAN LEVEL 1A1.3 STRUCTURAL PLAN LEVEL 2A1.4 STRUCTURAL PLAN LEVEL 3A2.1 CONSTRUCTION PLAN LOWER LEVELA2.2 CONSTRUCTION PLAN LEVEL 1A2.3 CONSTRUCTION PLAN LEVEL 2A2.4 CONSTRUCTION PLAN LEVEL 3A2.5 ENLARGED STAIR PLANSA2.6 ENLARGED EGRESS STAIR PLANSA3.1 REFLECTED CEILING PLAN LOWER LEVELA3.2 REFLECTED CEILING PLAN LEVEL 1A3.3 REFLECTED CEILING PLAN LEVEL 2A3.4 REFLECTED CEILING PLAN LEVEL 3A3.5 ENLARGED REFLECTED CEILING PLANSA4.1 ELECTRICAL PLAN LOWER LEVELA4.2 ELECTRICAL PLAN LEVEL 1A4.3 ELECTRICAL PLAN LEVEL 2A4.4 ELECTRICAL PLAN LEVEL 3A5.1 FINISH PLAN LOWER LEVELA5.2 FINISH PLAN LEVEL 1A5.3 FINISH PLAN LEVEL 2A5.4 FINISH PLAN LEVEL 3A6.1 FURNITURE PLAN LOWER LEVELA6.2 FURNITURE PLAN LEVEL 1A6.3 FURNITURE PLAN LEVEL 2A6.4 FURNITURE PLAN LEVEL 3A8.1 BUILDING SECTIONSA8.2 ENLARGED SECTIONSA8.3 ELEVATIONSA9.1 STAIR DETAILSA9.2 PARTITION DETAILS
ABBREVATIONS:AFF- ABOVE FINISH FLOORBD- BOARDCAR- CARPETDIM- DEMENSIONFURN- FURNITUREMANU- MANUFACTURERPT- PAINTTYP- TYPICALUNO- UNLESS NOTED OTHERWISEVIF- VERIFY IN FEILDWD- WOOD
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
11/7
/201
3 3:
12:0
1 PM
A0.1
GENERAL NOTES
CheckerAuthor
Issue Date22-3809
GENERAL NOTES:1. THE GENERAL CONTRACTOR SHALL VISIT THE SITE AND BE KNOWLEDGEABLE OF EXISTING SITE CONDITIONS. THE CONTRACTOR SHALL INVESTIGATE, VERIFY, AND BE RESPONSIBLE FORALL PROJECT DIMENSIONS AND CONDITIONS, AND SHALL NOTIFY PGAI DESIGN PARTNERS, LLC OF ANY DISCREPANCIES, OMISSIONS, AND/OR CONFLICTS BEFORE PROCEEDING WITHCONSTRUCTION AND/OR FABRICATION.2. ALL WORK SHALL BE COMPLETED FOR THE AGREED CONTRACT PRICE WITHOUT RECOURSE TO LABOR STOPPAGES OR REVISIONS OF GOVERNING REGULATIONS, LAWS, AND CODES. UNLESSNOTED BY THE CONTRACTOR IN THE BID FOR THE PROJECT, ALL WORK SHALL BE COMPLETED AS SHOWN WITHOUT LIMITATIONS, EXCLUSIONS, OR MODIFICATIONS.3. AFTER THE JOB IS IN PROGRESS THE CONTRACTOR SHALL NOT PROCEED WITH ANY ADDITIONAL WORK OR CHANGES FOR WHICH ADDITIONAL COMPENSATION IS EXPECTED WITHOUTWRITTEN "CHANGE ORDERS" AUTHORIZED BY OWNER. FAILURE TO OBTAIN PRIOR AUTHORIZATION BY CHANGE ORDER OR REQUEST FOR PROPOSAL CAN INVALIDATE A CLAIM FOR ADDITIONALCOMPENSATION. PER BUILDING MANAGEMENT, FULL TIME SUPERVISION IS REQUIRED.4. TIME IS OF THE ESSENCE AND THE CONTRACTOR SHALL KEEP SUFFICIENT WORKERS ON THE JOB AT ALL TIMES TO PERFORM THE WORK IN THE MOST EXPEDITIOUS MANNER CONSISTENTWITH GOOD WORKMANSHIP AND SOUND BUSINESS PRACTICE. THE CONTRACTOR SHALL CONFIRM THAT ALL ITEMS WILL BE ORDERED, FABRICATED AND INSTALLED PRIOR TO THE AGREEDCOMPLETION DATE. EXCEPTIONS WILL NOT BE ALLOWED WITHOUT WRITTEN AUTHORIZATION OF THE OWNER PRIOR TO PLACEMENT OF WORK.5. THERE SHALL BE NO SUBSTITUTION OF MATERIALS WHERE A MANUFACTURER IS SPECIFIED. WHERE THE TERM "OR APPROVED EQUAL" IS USED, PLY CREATIVE STUDIO, LLC SHALLDETERMINE SUITABILITY BASED ON INFORMATION SUPPLIED BY THE CONTRACTOR ON A TIMELY BASIS.6. ALL MATERIALS SHALL BE NEW, UNUSED, AND OF THE HIGHEST QUALITY IN EVERY RESPECT UNLESS NOTED OTHERWISE. MANUFACTURED MATERIALS AND EQUIPMENT SHALL BEINSTALLED AS PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS UNLESS NOTED OTHERWISE.7. THESE GENERAL CONDITIONS APPLY TO ALL WORK AND DRAWINGS IN THIS SET AND SHALL EXTEND TO ALL CHANGES, EXTRAS, OR ADDITIONS AGREED TO DURING THE COURSE OF THEWORK.8. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE SHOWN. WHERE SPECIFIED DIMENSIONS, DETAILS, OR DESIGN INTENT CANNOT BE DETERMINED, NOTIFY NOTIFY PLY CREATIVESTUDIO, LLC BEFORE PROCEEDING WITH CONSTRUCTION AND/OR FABRICATION.9. DO NOT SCALE DRAWINGS. USE REFERENCE LINES OR CONTACT PLY CREATIVE STUDIO, LLC FOR ASSISTANCE. LARGE SCALE DETAILS TAKE PRECEDENCE OVER SMALLER SCALE PLANS.10. ALL PARTITIONS ARE DIMENSIONED FACE TO FACE UNLESS OTHERWISE NOTED. ALL ALIGNMENT INDICATIONS ARE FROM FINISHED SURFACES UNLESS OTHERWISE NOTED.11. FOR INFORMATION CONCERNING COLUMNS, EXTERIOR WALLS, CORE AREA, ETC. SEE BUILDING ARCHITECTURAL DOCUMENTS.12. THE CONTRACTOR SHALL EXERCISE CARE AND SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING CONDITIONS.13. MAINTAIN ALL EXISTING BUILDING SERVICES IN USE AT ALL TIMES UNLESS PERMISSION IS RECEIVED FROM BUILDING MANAGEMENT TO TEMPORARILY INTERRUPT SERVICE. PERMANENTLYRECONNECT ALL SERVICES DISRUPTED BY THE PROJECT WORK WHETHER INSIDE OR OUTSIDE THE PROJECT AREA.14. THE CONTRACTOR SHALL EXECUTE THE WORK IN A CAREFUL AND ORDERLY MANNER WITH THE LEAST DISRUPTION TO THE OCCUPANTS OF THE BUILDING.15. DO NOT CLOSE, OBSTRUCT, OR STORE MATERIALS IN WALKWAYS, PASSAGEWAYS, STAIRS, CORRIDORS, OR OTHER MEANS OF EGRESS.16. THE CONTRACTOR SHALL SUBMIT ALL SAMPLES, SHOP DRAWINGS, OR OTHER SUBMITTALS TO PLY CREATIVE STUDIO, LLC PRIOR TO COMMENCEMENT OF WORK. SAMPLES OF PAINT THATARE BEING FIELD APPLIED SHALL BE SUBMITTED ON THE MATERIAL TO WHICH THEY WILL BE APPLIED. FIVE 12" X 12" SAMPLES OF ALL MATERIALS WILL BE REQUIRED FOR APPROVAL. ONEPRINT COPY AND ONE REPRODUCIBLE COPY OF ALL SHOP DRAWINGS WILL BE REQUIRED.17. ALL CONTRACTORS ARE RESPONSIBLE FOR THE LAYOUT OF EQUIPMENT AND CABLE RUNS TO AVOID INTERFERENCE.18. IF CEILING DIFFUSERS, LUMINARIES, OR OTHER ELEMENTS ON OR ABOVE THE CEILING CANNOT BE LOCATED AS SHOWN ON THE PLAN DUE TO OBSTRUCTIONS, THIS SHOULD BE NOTEDDURING THE BIDDING PHASE SO REVISIONS MAY BE ISSUED AND INCLUDED IN THE BIDS.19. THE CONTRACTOR SHALL COOPERATE WITH AND COORDINATE THE WORK OF TELEPHONE, QUOTE, OR OTHER COMMUNICATIONS COMPANIES REQUIRED AND RETAINED BY THE CLIENT.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REPAIR AND PATCHING WORK REQUIRED AT THE END OF THEIR WORK.20. ALL WORK SHALL BE ERECTED PLUMB, LEVEL, TRUE, AND SQUARE AND IN PROPER ALIGNMENT. IF, IN THE OPINION OF PLY CREATIVE STUDIO, LLC WORK IS NOT ERECTED WITHIN PROPERAND ACCEPTED TOLERANCES, THE CONTRACTOR IS RESPONSIBLE FOR CORRECTING SUCH WORK AT NO EXPENSE TO THE CLIENT.21. WHERE NEW WORK CONNECTS TO EXISTING CONSTRUCTION, THE CONTRACTOR SHALL PERFORM ALL NECESSARY CUTTING, FITTING, AND PATCHING. HE SHALL FURNISH ALL NECESSARYLABOR AND MATERIALS TO THIS END.22. ALL FLOORS SHALL BE LEVELED AND FREE OF IRREGULARITIES TO ASSURE ONE CONSTANT HEIGHT.23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR BRACING OF PARTITIONS AS REQUIRED AND FOR ALL DOOR AND WINDOW OPENINGS.24. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE BRACING AND BLOCKING OF PARTITIONS, RECEIVING MILLWORK, SHELVING, BOOKCASES, FURNITURE COMPONENTS, ETC.25. ALL PARTITION OPENINGS FOR ELECTRICAL, TELEPHONE, COMMUNICATION, AND SWITCH BOXES ARE TO BE CAULKED AND OFFSET ON OPPOSITE SIDES OF THE PARTITIONS TO PREVENTSOUND TRANSMISSION.26. ALL CORNERS OF TRIMMED OPENINGS SHALL HAVE METAL CORNER BEADS UNLESS OTHERWISE NOTED.27. THE CONTRACTOR SHALL COORDINATE FINISHED PARTITIONS WITH DIMENSIONAL REQUIREMENTS OF FILES, STORAGE CABINETS, AND MILLWORK.28. DOORS AND FRAMES WHICH REQUIRE A FIRE RESISTIVE RATING SHALL BE A TYPE APPROVED BY THE NATIONAL BOARD OF FIRE UNDERWRITERS.29. THE CONTRACTOR IS RESPONSIBLE FOR HARDWARE COORDINATION INCLUDING OBTAINING AND DISTRIBUTING SPECIAL TEMPLATES AS REQUIRED AND SHALL NOTIFY PGAI DESIGNPARTNERS, LLC OF ANY DISCREPANCIES. ALL LOCK HARDWARE TO BE COMPATIBLE TO BUILDING STANDARD KEYING SYSTEM.30. THE CONTRACTOR IS TO REPAIR AND PATCH EXISTING WINDOW MULLIONS AS REQUIRED.31. PRIOR TO PAINTING ANY AND ALL DEBRIS, JOINTS, AND IRREGULARITIES IN EXISTING OR NEW CONSTRUCTION IS TO BE FILLED WITH AN APPROVED FILLER SUITABLE FOR THE PURPOSEAND SANDED TO A SMOOTH, EVEN SURFACE.32. NO FINISH SHALL BE APPLIED UNTIL THE SURFACES ARE ABSOLUTELY DRY, CLEAN AND IN PROPER CONDITION TO RECEIVE SUCH FINISH.33. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ONE SET OF REPRODUCIBLE "AS-BUILT" DRAWINGS AND MAINTENANCE MANUALS TO THE OWNER PRIOR TO FINAL PAYMENT.34. DOORS AND FRAMES WHICH REQUIRE A FIRE RESISTIVE RATING SHALL BE A TYPE APPROVED BY THE NATIONAL BOARD OF FIRE UNDERWRITERS.35. GYPSUM BOARD CONTROL JOINTS SHALL BE PROVIDED IN ACCORDANCE WITH RECOMMENDED PRACTICES OF GYPSUM ASSOCIATION AND U.S.G. CORPORATION.36. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES, AND INSURANCE REQUIREMENTS. GIVE ALL NECESSARY NOTICES, PAY ALL FEES REQUIRED BY LAW AND COMPLYWITH ALL LAWS, ORDINANCES AND REGULATIONS APPLICABLE TO THE PROJECT. ANY EXPENDITURES INCURRED ARE TO BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AS PART OF THEESTIMATE FOR THE PROJECT.37. REMOVE DEBRIS AS WORK PROGRESSES. MAINTAIN THE PREMISES IN A NEAT AND CLEAN CONDITION. UPON COMPLETION OF ALL WORK, REMOVE ALL MATERIALS AND RUBBISH. GENERALCONTRACTOR TO PROVIDE DUMPSTERS; COORDINATE WITH BUILDING MANAGEMENT FOR LOCATION.38. GENERAL CONTRACTOR MUST MAINTAIN PUBLIC AREAS ADJACENT TO CONSTRUCTION SITE(S) FREE OF DUST AND DEBRIS. THESE AREAS TOINCLUDE CORRIDORS, ELEVATOR LOBBIESAND ELEVATOR CABS. PRE CONSTRUCTION WALK-THRU AND POST CONSTRUCTION WALK-THRU; GENERAL CONTRACTOR TO PROVIDE WALK-THRU FORMS FOR CHIEF ENGINEER TO COMPLETE.39. GENERAL CONTRACTOR MUST KEEP ALL CONSTRUCTION SITES SECURED WITH DOORS AND BUILDING KEYED LOCKS. G.C. RESPONSIBLE FOR UNLOCKING DOORS IN MORNING AND LETTINGTHEIR SUBCONTRACTORS IN TO START WORK AND FOR LOCKING DOORS AT END OF DAY WHEN THEY ARE DONE.
Level 10' - 0"
Level -1-18' - 0"
SPR
OU
T H
EIG
HT
3' -
0" T
YP.
SPR
OU
T H
EIG
HT
3' -
4" T
YP.
WHEELCHAIRACCESSIBLESPROUT OUTLET
SPROUT OUTLETFOR STANDINGPERSONS
Level -1-18' - 0"
TYP.
4' -
0"
TYP.
6' -
0"
HALL LANTERN
CALL BUTTONS
Level 10' - 0"
Level -1-18' - 0"
2
STAIR
TYP.
4' -
0"
MIN
.
0' -
6"
MA
X.
5' -
0"
TYP
. 0'
- 6
1/2"
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/2" = 1'-0"
11/7
/201
3 3:
12:0
4 PM
A0.2
ACCESSIBILTYGENERAL NOTES
CheckerAuthor
Issue Date22-3809
THIS PROJECT WILL COMPLY WITH ALL ICC/ANSIA117.1-2003 REQUIREMENTS.THIS IS AN EXISTING BUILDING WITH AN ACCESSIBLE ENTRANCE PER IIC/ANSI A117.1-2003, 404 AND AN ACCESSIBLE ROUTE TO THE ALTERED SPACE PER ICC/ANSI A117.1-2003, 402.PASSENGER ELEVATORS SHALL HAVE AT LEAST A 36" X 54" INTERIOR CAB AREA. ELEVATOR CONTROLS TO BE MOUNTED NO HIGHER THAN 48" MEASURED TO THE CENTERLINE OF THE HIGHEST OPERABLE PART, AND BRAILLE PROVIDED AT ALL CALL BUTTONS TO COMPLY W/ ICC/ANSI A117.1-2003, 407.4.7.1.TOILET ROOMS FOR THE ALTERED SPACE ARE IN FULL COMPLIANCE WITH ICC/ANSI A117.1-2003, 604.ALL NEW OR ALTERED WORK SHALL COMPLY AS FOLLOWS:1. ALL DOORS LEADING TO REQUIRED ACCESSIBLE ROOMS AND SPACES SHALL BE A MIN. 32" WIDE, HAVE LEVER OPERATED HARDWARE (OR EQUAL), HAVE A MIN. OPENING FORCE OF 5 LBS, AND COMPLY WITH ICC/ANSI A117.1-2003, 404.2. CLOSETS SHALL CONTAIN COAT ROD & SHELF MOUNTED AT HEIGHT OF 40"-48" A.F.F. PER ICC/ANSI A117.1-2003, 803.5.3. ALL ENVIRONMENTAL CONTROLS AND OPERATING MECHANISMS WILL COMPLY WITH ICC/ANSI A117.1-2003, 308, (FRONT REACH BETWEEN 15" AND 48" A.F.F.).4. ALL EMERGENCY WARNING ALARMS WHERE PROVIDED SHALL BE BOTH AUDIBLE AND VISUAL, SHALL BE SYNCHRONIZED, AND COMPLY WITH ICC/ANSI A117.1-2003, 702.15. ANY NEW SIGNAGE IN CONTRACT SHALL BE INSTALLED AS REQUIRED PER ICC/ANSI A117.1-2003, 703.6. SALES AND SERVICE COUNTER SHALL BE PROVIDED AT 36" MAXIMUM IN HEIGHT ABOVE FINISHED FLOOR IN ACCORDANCE WITH ICC/ANSI 117.1-2003, 904.3.7. HI/LOW WATER FOUNTAINS SHALL BE PROVIDED ON EACH FLOOR PER CBC 10 (13-160), ICC/ANSI 117.1- & CHICAGO PLUMBING CODE.8. ALL WALL-MOUNTED CABINETRY AND SHELVING SHALL COMPLY WITH ICC/ANSI 117.1-2003, 308, (FRONT AND SIDE REACH BETWEEN 15" AND 48" A.F.F.).9.A MINIMUM OF 5% OF EACH TYPE OF LOCKER SHALL BE FULLY ACCESSIBLE PER ICC/ANSI 117.1-2003, 305, 308, & 803)
ACCESSIBILTY GENERAL NOTES
1/2" = 1'-0"1
DRINKING FOUNTAIN ELEVATION ADASTANDARDS
1/2" = 1'-0"2 ELEVATOR ELEVATION ADA STANDARDS 1/2" = 1'-0"3 DOOR ELEVATION ADA STANDARD
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
11/7
/201
3 3:
12:0
7 PM
A0.3
SCHEDULES
CheckerAuthor
Issue Date22-3809
DOOR SCHEDULE
MARK FRAME MATERIAL DOOR MATERIAL HEIGHT WIDTH
FIRERATING COMMENTS
001 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
8' - 7 1/2" 5' - 1 29/32" HARDWARESET 1
002 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
8' - 5 1/2" 5' - 8 11/16" HARDWARESET 1
003 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 6' - 0" HARDWARESET 1
004 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 5' - 8" 90 MIN HARDWARESET 1
005 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 6' - 0" HARDWARESET 1
006 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 6' - 0" HARDWARESET 1
007 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
6' - 6" 6' - 0" HARDWARESET 1
007 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 6' - 0" HARDWARESET 1
008 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 3' - 0" HARDWARESET 1
009 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 3' - 0" HARDWARESET 1
010 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 6' - 0" HARDWARESET 1
011 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 5' - 8" 90 MIN HARDWARESET 1
012 POLISHEDSTAINLESS STEEL
POLISHEDSTAINLESS STEEL
12' - 0" 3' - 6" 90 MIN ELEVATORDOOR
013 POLISHEDSTAINLESS STEEL
POLISHEDSTAINLESS STEEL
7' - 0" 3' - 6" 90 MIN ELEVATORDOOR
101 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 3' - 0" 90 Min HARDWARESET 1
102 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
15' - 0" 10' - 0" HARDWARESET 1
103 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
15' - 0" 10' - 0" ELEVATORDOOR
104 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
15' - 0" 10' - 0" ELEVATORDOOR
105 POLISHEDSTAINLESS STEEL
POLISHEDSTAINLESS STEEL
12' - 0" 3' - 6" 90 MIN ELEVATORDOOR
106 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 5' - 8" 90 MIN HARDWARESET 1
201 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 3' - 0" 90 MIN HARDWARESET 1
202 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 6' - 0" HARDWARESET 1
203 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 3' - 0" HARDWARESET 1
204 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 3' - 0" HARDWARESET 1
205 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 6' - 0" HARDWARESET 1
206 POLISHEDSTAINLESS STEEL
POLISHEDSTAINLESS STEEL
7' - 0" 3' - 6" 90 MIN ELEVATORDOOR
301 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 3' - 0" 90 MIN HARDWARESET 1
302 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 3' - 0" HARDWARESET 1
303 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 3' - 0" HARDWARESET 1
304 PAINTED METALFRAME, PT-2
PAINTED METALFRAME, PT-2
7' - 0" 3' - 0" HARDWARESET 1
305 POLISHEDSTAINLESS STEEL
POLISHEDSTAINLESS STEEL
7' - 0" 3' - 6" 90 MIN ELEVATORDOOR
Manufacturer
Light Fixture Schedule
F-1 LIGHTOLIER
Model
PROSPEC
Lamp Finish Mounting Height
Par3075W Max
MATTEWHITE
CEILING MOUNT UNO
F-2 MICROSQUARELED - 4'
PHILIPSFortimoLED
MATTEWHITE
1' - 0" BELOW FINSIHEDCEILING UNO
F-3 LZF L-CLUB-S T-5(2) 35W Max
21-CHERRY BASE MOUNTED @ 6' AFF, UNO
F-4 LZF ROMANICA-S30
11W LED 21-CHERRY
F-5 LYTECASTERLED 5"
12.5W MaxLED
MATTEWHITE
RECESSED
F-6 LZF X- Club-S T-5(2) 14W Max
21-CHERRY SEE ELEVATIONS FORMOUNTING HEIGHT
F-7 LG SERIES-EXIT SIGN
AC-Powered MATTEWHITE
SURFACE MOUNTED 12"ABOVE DOOR FRAME
F-8 MICROSQUARELED - 8'
PHILIPSFortimoLED
MATTEWHITE
1' - 0" BELOW FINISHEDCEILING UNO
F-10 LZF X- CLUB-SG T-5(2) 21W Max
21-CHERRY SEE ELVATIONS FORMOUNTING HEIGHT
F-4 LZF ROMANICA-S120
(2) 11W LED 21-CHERRY BASE MOUNTED 10'AFF, UFO
Mark
MANU.
FINISH SCHEDULE
PT-1 SHERWINWILLIAMS
PRODUCT
EMERALD
COLOR FINISH COMMENTS
SW 7005 EGGSHELL ALL WALLS UFO
WD-1 ARMSTRONG PERFORMANCEPLUS
WALNUT,SHELL WH.
MEDIUMGLOSS
FLOAT INSTALLATION
CAR-1 SHAWCONTRACT
LAZER CUTTILE
95330 BRICKINSTALLATION
CT-1 DALTILE CONTINENTALSLATE, 3X3
ENGLISHGREYCS57
CONC-1
POLISHED CONTROL JOINT EVERY10'
MARK
PARTITION TYPE
PARTITION TYPE
1 EXISITING
TRANS. WIDTH ASSEMBLY COMMENTS
Brick
2 MASONRYUNIT
12" CONCRETEBLOCK
3 STANDARDGYP.
4 CHASE
5 METALFRAME
MARK
CURTAINWALL
6 2- HOUR FIRERATED
TRANSPARENT
6"
8"
6"
ExistingSOLID
3"
METAL STUD
METAL STUD
METAL STUD
MANU.
FURNITURE SCHEDULE
F-1 HERMANMILLER
PRODUCT
AIRCHAIR
COLOR COMMENTS
WHITE
F-2A BAGUETTETABLE
30" HIGHTABLE
F-2B
F-3A DWR RALEIGHSOFA
WHEAT32623
MARK
36" HIGHTABLE
LENGTH/HEIGHT
85" SOFA
F-3A DWR WHEAT32623
60" SOFA
FABRIC PROTECTIONMUST BE APPLIED
FABRIC PROTECTIONMUST BE APPLIED
FS-1A CANVAS TYP. GROUPINGCANVAS019
LIGHTOLIER
LIGHTOLIER
LIGHTOLIER
LIGHTOLIER
BASE MOUNTED @ 6' AFF, UNO
SOLID
SOLID
SOLID
SOLID
HERMANMILLER
HERMANMILLER
HERMANMILLER
BAGUETTETABLE
RALEIGHSOFA
1 2 3 4 5 6 7 8 9
A
B
C
36' -
2 3
/4" T
YP.
25' - 0" TYP.
0' -
2"TY
P.0'
- 8"
SUPPORT STRUCTURE TO BEINSTALLED, SEE DETAIL FOR TYP.STANDARD
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
12:1
0 PM
A1.1
STRUCTURALPLAN LOWER
LEVEL
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 STRUCTURAL PLAN LOWER LEVEL
1 2 3 4 5 6 7 8 9
A
B
C
TYP.
25' - 0"
TYP.
36' -
2 3
/4"
8' - 1"
4' -
5 3/
4"
2' -
9"
6' - 7" 1' - 10"
TYP.
0' -
8"
5' -
0"
0' -
10"
3' -
8"
1' -
3 1/
2"
OPEN TOBELOW
OPENTO
BELOW
SUPPORT STRUCTURE TO BEINSTALLED, SEE DETAIL
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
12:1
2 PM
A1.2
STRUCTURALPLAN LEVEL 1
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 STRUCTURAL PLAN LEVEL 1
1 2 3 4 5 6 7 8 9
A
B
C
4' -
8"
15' -
5"
8' - 9 1/2"0' - 8"
5' - 4"
3' -
7"3'
- 7
3/4"
0' -
8"
0'
- 8
"
0' - 8"
5' -
0"
0'
- 8
"
5'
- 0
1/2
"
3' - 1" 0' - 8"4' - 7"
OPEN TOBELOW
OPEN TOBELOW
OPENTO
BELOW
TYP.
25' - 0"
TYP.
36' -
2 3
/4"
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
12:1
5 PM
A1.3
STRUCTURALPLAN LEVEL 2
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 Structural Plan Level 2
SUPPORT STRUCTURE TO BEINSTALLED
1 2 3 4 5 6 7 8 9
A
B
C
4' -
8"
0' -
8"
11' -
0"
5' -
0"
0'
- 8
"
5
' -
0"
4' - 7 1/4" 0' - 8" 4' - 1" 5' - 4"
0' -
8"
4' -
6"2'
- 9"
7' - 7" 0' - 8"
7' - 5"
OPEN TOBELOW
OPENTO
BELOW
OPENTO
BELOW
SUPPORT STRUCTURE TO BEINSTALLEDTY
P.
36' -
2 3
/4"
TYP.
25' - 0"
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
12:1
7 PM
A1.4
STRUCTURALPLAN LEVEL 3
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 STRUCTURAL PLAN LEVEL 3
UP
UPUP
1 2 3 4 5 6 7 8 9
A
B
C
PROJECTSTORAGE
007
MATERIALSTORAGE
008
WC009
WC0010
Mechanical011
EGRESS STAIR012009008
CLASSROOM003
LIBRARY001
STORAGE004
EGRESS STAIR005
88' -
8 3
/4"
38' -
8 1
/2"
205' - 0 1/4"
27' - 2 1/2"
8' -
9 1/
2"
23' - 10 3/4" 35' - 0 1/8" 34' - 7 1/8" 7' - 0" 6' - 0" 7' - 0" 10' - 0 3/4" 7' - 11"
3' -
2"
5' -
8"
6' - 0"
5' -
8"
1' - 1 3/4"
9' - 1 19/32"
WORKSHOP006
WORKSHOPRECEPTION
002
TOOL CHECKOUT0013
4' - 1" 3' - 11"
4' - 4" 3' - 11" 4' - 1" 4' - 0"
2' -
5 1/
4"
2' -
5 1/
4"
5' - 0"
3' - 11 1/2"
0' -
6"
30' - 0" 4' - 9"
7' -
11"
7' - 3 1/2"
A2.51
3' -
4" 4' - 0"
2A8.1
1A8.1
LIFT0014
LIFT015
002
001
005 007011
010007006004
003
A2.61
012
013
2A8.2
1A8.2
7' -
7"
A0.2
1 Elevation 1 - a
A0.22
Elev
atio
n 1
- c
A0.2
3ELEVATION 2 -a
4
Generic - 12"
44446
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
12:2
0 PM
A2.1
CONSTRUCTIONPLAN LOWER
LEVEL
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 CONSTRUCTION PLAN LOWER LEVEL
Notes:1. ALL EXISITNG WALLS TO REMAIN ARE TO BE REPAIRED ASREQUIRED FOR A LIKE NEW APPEARANCE2. ALL DOOR SIZES ARE NOMINAL3. ALL DOORS USED IN CONNECTION WITH EXITS SHALL BE ABLE TOBE READILY OPENED WITHOUT THE USE OF A KEY4. ALL THRESHOLDS SHALL NOT EXCEED ONE-HALF INCH IN HEIGHT5. DOOR CLOSERS SHALL MEET OPENING FORCE AND SWEEP PERIODREQUIREMNTS
UP
DN
UP
1 2 3 4 5 6 7 8 9
A
B
C
7' -
6 3/
4"1'
- 0"
5' -
5 1
/2"
5' -
8"
9' - 1 1/2" 6' - 0"
EQEQ
12' - 6 3/4"
10' -
4"
10' -
4"
7' -
8 3/
4" TYP.
3' -
8"
8' - 5" 11' - 0"
4' - 1"
A2.52
2' -
7"
12' - 6 3/4"
10' - 4"
9' - 3 1/2"
OPEN TO BELOW
2A8.1
1A8.1
CAFE101
LIFT102
Egress Stair103
103
104
102 101
105
3' - 11 1/2"
106
A2.62
2A8.2
1A8.2
46
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
12:2
2 PM
A2.2
CONSTRUCTIONPLAN LEVEL 1
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 CONSTRUCTION PLAN LEVEL 1
Notes:1. ALL EXISITNG WALLS TO REMAIN ARE TO BE REPAIRED ASREQUIRED FOR A LIKE NEW APPEARANCE2. ALL DOOR SIZES ARE NOMINAL3. ALL DOORS USED IN CONNECTION WITH EXITS SHALL BE ABLE TOBE READILY OPENED WITHOUT THE USE OF A KEY4. ALL THRESHOLDS SHALL NOT EXCEED ONE-HALF INCH IN HEIGHT5. DOOR CLOSERS SHALL MEET OPENING FORCE AND SWEEP PERIODREQUIREMNTS
DNUP
1 2 3 4 5 6 7 8 9
A
B
C
A2.53
4'
- 8
"
11
' - 1
1/2
"
20' - 2"
16' - 2"
6' - 5 1/2" 5' - 8 1/2"
3' - 10 1/2" 1' - 9 1/2"
7' -
6 3/
4" 13
' - 8
1/2
"
7' -
8 1
/2"
1' - 2 1/2"
3' -
8"
2' -
9"
2' - 11 1/4"
2A8.1
1A8.1
WC204
CONFERENCEROOM
302
CORRIDOR201
EMPLOYEELOUNGE
207
EGRESS STAIR202
LIFT206
203 204
202
205
201
206
WC205
2A8.2
1A8.2
Generic - 12"Generic - 12"
4
46
4
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
12:2
5 PM
A2.3
CONSTRUCTIONPLAN LEVEL 2
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 COSNTRUCTION PLAN LEVEL 2
Notes:1. ALL EXISITNG WALLS TO REMAIN ARE TO BE REPAIRED ASREQUIRED FOR A LIKE NEW APPEARANCE2. ALL DOOR SIZES ARE NOMINAL3. ALL DOORS USED IN CONNECTION WITH EXITS SHALL BE ABLE TOBE READILY OPENED WITHOUT THE USE OF A KEY4. ALL THRESHOLDS SHALL NOT EXCEED ONE-HALF INCH IN HEIGHT5. DOOR CLOSERS SHALL MEET OPENING FORCE AND SWEEP PERIODREQUIREMNTS
DN
DN
1 2 3 4 5 6 7 8 9
A
B
C
7' -
6 3/
4"
5' -
6"
6' - 5" 5' - 2"
11' - 7"
13' -
10
1/2"
7' -
7"
4' -
0"
4' -
4 1
/2"
8' - 5"
3' - 4"
18' -
3"
14' -
0"
10' - 11"
2' -
2"
1' - 3 1/2"
2' - 2 1/4"
2' -
7"
3' -
4"
7' -
5 3/
4"
0' -
6"
2A8.1
1A8.1
MEETING ROOM304
EGRESS STAIR303
WC305
DIRECTORSOFFICE
309
CORRIDOR301
LOUNGE302
WC306
LIFT307
EMPLOYEE WORKAREA308
302 303
304
301
305
A2.54
2A8.2
1A8.2
Generic - 12"
4
4
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
12:2
7 PM
A2.4
CONSTRUCTIONPLAN LEVEL 3
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 CONSTRUCTION PLAN LEVEL 3
64
Notes:1. ALL EXISITNG WALLS TO REMAIN ARE TO BE REPAIRED ASREQUIRED FOR A LIKE NEW APPEARANCE2. ALL DOOR SIZES ARE NOMINAL3. ALL DOORS USED IN CONNECTION WITH EXITS SHALL BE ABLE TOBE READILY OPENED WITHOUT THE USE OF A KEY4. ALL THRESHOLDS SHALL NOT EXCEED ONE-HALF INCH IN HEIGHT5. DOOR CLOSERS SHALL MEET OPENING FORCE AND SWEEP PERIODREQUIREMNTS
DNUP
UP
DNUP
DN
2 3
B
TYP.
3' - 8"0' - 4 1/4"
15' -
7"
2' - 9 5/16"
LIFT206
CORRIDOR201
2 3
B
TYP.
3' - 8"
12' -
10"
3' -
8"
3' - 8"13' - 9"
3' - 3"
LIFT015
LIBRARY001
A9.11
2 3
B
TYP.
3' - 8"
15' -
7"
4' -
8"
CORRIDOR301
2 3
B
11' - 0" 3' - 8"
TYP.
3' -
8"
16' -
3"
10' - 2"
8' - 7 1/2"
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/4" = 1'-0"
11/7
/201
3 3:
12:3
2 PM
A2.5
ENLARGED STAIRPLANS
CheckerAuthor
Issue Date22-3809
1/4" = 1'-0"3
ENLARGED CONSTRUCTION PLAN LEVEL2
1/4" = 1'-0"1
ENLARGED CONSTRUCTION PLANLOWER LEVEL
1/4" = 1'-0"4
ENLARGED CONSTRUCTION PLAN LEVEL3
1/4" = 1'-0"2
ENLARGED CONSTRUCTION PLAN LEVEL1
Notes:1. ALL EXISITNG WALLS TO REMAIN ARE TO BE REPAIRED ASREQUIRED FOR A LIKE NEW APPEARANCE2. ALL DOOR SIZES ARE NOMINAL3. ALL DOORS USED IN CONNECTION WITH EXITS SHALL BE ABLE TOBE READILY OPENED WITHOUT THE USE OF A KEY4. ALL THRESHOLDS SHALL NOT EXCEED ONE-HALF INCH IN HEIGHT5. DOOR CLOSERS SHALL MEET OPENING FORCE AND SWEEP PERIODREQUIREMNTS
7 8 9
A
TOOL CHECKOUT0013
LIFT0014
EGRESS STAIR012
11' - 11" 4' - 0" 14' - 8"
30' - 7"
3' -
0"
3A8.2
7 8 9
A
3A8.2
10' - 8"
7' -
7" 4'
- 0
1/2"
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/4" = 1'-0"
11/7
/201
3 3:
12:3
4 PM
A2.6
ENLARGEDEGRESS STAIR
PLANS
CheckerAuthor
Issue Date22-3809
1/4" = 1'-0"1
ENLARGED CONSTRUCTION PLANLOWER LEVEL
1/4" = 1'-0"2
ENLARGED CONSTRUCTION PLAN LEVEL1
Notes:1. ALL EXISITNG WALLS TO REMAIN ARE TO BE REPAIRED ASREQUIRED FOR A LIKE NEW APPEARANCE2. ALL DOOR SIZES ARE NOMINAL3. ALL DOORS USED IN CONNECTION WITH EXITS SHALL BE ABLE TOBE READILY OPENED WITHOUT THE USE OF A KEY4. ALL THRESHOLDS SHALL NOT EXCEED ONE-HALF INCH IN HEIGHT5. DOOR CLOSERS SHALL MEET OPENING FORCE AND SWEEP PERIODREQUIREMNTS
V V
1 2 3 4 5 6 7 8 9
A
B
C
2' - 8 3/4"
21' -
9 1
/2"
6' - 8 3/4"
2' -
10 1
/2"
1' -
3"
2' - 8 1/4" 4' - 0"
1' -
2 3
/4"
8' - 0" 2' - 4"
2' -
10 1
/2"
2' -
10 1
/2"
2' -
10 1
/2"
2' -
10 1
/2"
8' - 6 3/4" 7' - 5 1/4"
0' - 9 3/4"
3' -
3"
12' - 2 1/4"
3' -
3"
2' -
10 1
/2"
6' - 4" 4' - 4 1/2"
1' -
3"
4' - 4 3/4"
21' -
9 1
/2"
4' - 2 3/4"
6' -
10
3/4"
7' - 0" 3' - 11" 3' - 1"
8' -
8 3
/4"
7' -
4 3
/4"
8' -
0"
F-1
F-1
F-1 F-1 F-1
F-1F-1F-1
F-1 F-1 F-1
F-1
F-1 F-1
F-1
F2
F2 F2 F2
F2
F2 F2 F2 F2
F2 F2 F2 F2
F2 F2
F-3
F-3
F-1 F-1 F-1
F-1F-1F-1
F-1
F-1
F-1 F-1
F-1 F-1
F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1
F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1
F-1F-1F-1F-1F-1F-1F-1F-1F-1F-1F-1
F-1 F-1 F-1
F-1
F-1
F-1 F-1
F-1
F-1 F-1
F-1
F-1 F-1
F-1
F-1 F-1
F-1
F-1 F-1 F-1
F-1F-1
F-1 F-1
F-1
F-1F-1
F-1F-1
F-1F-1
F-1F-1
F-1
F-1
F-1F-1
F-1F-1
F-1F-1
F-1F-1
S2 S2
S2S2S2
S2 S2
S2 S2 S2
S2S2S2
S2 S2
S2 S2 S2
S2S2S2
S2 S2
S2 S2 S2
S2S2S2
S2 S2
S2 S2 S2
S2S2S2
S2 S2
S2 S2 S2
S2S2S2
S2 S2
S2 S2 S2
S2S2S2
S2 S2
S2 S2 S2
S2S2S2
S2 S2
S2 S2 S2
S2S2S2
S2 S2
S2
S2
S20 S20 S20
S19S19S19
S19 S19
S20
S19
F-8
F-2 F-2
F-8 F-8 F-8 F-8 F-9F-9 F-2F-2
F-9 F-9 F-9
F-10F-10
F-10
F-10 F-10
F-6
F-6
F-6
F-6
F-6
F-7
F2
F2
F2
F-7
s
S1
19s20
s21
S20
s s22 22
S22S22
s s
s s
s23 23
24 25
26
S22 S22S24 S25
S2 S2 S2
S26
S2
S2
S2
S2S2
S2
S2
S2
S2
S2
F-7
2' -
8"
2' -
8"
S24 S24
OPEN TO ABOVE
5' - 0"
TYP.
12' - 0"
7' -
9 1/
2"
TYP.
12' -
0"
4' - 5" 12' - 0"
3' -
2 3/
4"
7' -
9 1/
2"
TYP.
12' -
0"
2' - 8 1/2"
TYP.
12' - 0"
3' -
2 3/
4"
6' - 4 1/32"
TYP.
12' - 0" 8' - 5" 3' - 5" 12' - 0"
4' -
7 3/
4"
4' -
6 3/
4"
1' -
7 1/
4"
12' - 0" 7' - 4"
EQEQ
4' - 8"
10'
- 5
1/4"
7' - 9 1/2"
6" / 1'-0" 1" / 1'-0"
LIBRARY001
WORKSHOPRECEPTION
002WORKSHOP
006CLASSROOM
003
STORAGE004
EGRESS STAIR005
PROJECTSTORAGE
007
MATERIALSTORAGE
008 WC009
WC0010
Mechanical011
LIFT0014
TOOL CHECKOUT0013
EGRESS STAIR012
17' - 0"
35' - 0"
A3.52
LIFT015
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
12:4
3 PM
A3.1
REFLECTEDCEILING PLANLOWER LEVEL
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1
REFLECTED CEILING PLAN LOWERLEVEL
Notes:1. ALL DIMENSIONS ARE FROM CENTER OF COLUMNS2. REFER TO SCHEDULES AND ELEVATIONS FOR HEIGHTSPECIFICATIONS3. ALL HEIGHTS ARE TAKEN FROM AFF TO BOTTOM OF FIXTURE, UNO
2 3
A
B
C
1' - 3 1/4"
1' -
3 1/
4" 3' - 3"
1' -
3 1
/4"
4' - 6 3/4"
12' -
4 1
/2"
4' - 2 3/4"
12' -
4 1
/2"
F-1F-1
F-1F-1
F-1F-1
F-1
ssss
ss
1
2
3
45
6
F-1 F-1S1 S1
S1S1
S1
S1
S1
S1 S1
F-2S2F-2S2
OPEN TO ABOVE
CAFE101
LIFT102
Egress Stair103
A3.51
4' - 10 1/2"
2' -
0"8'
- 0"
OPEN TO ABOVE
A8.3
1 Elevation 2 - c
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
12:4
7 PM
A3.2
REFLECTEDCEILING PLAN
LEVEL 1
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 REFLECTED CEILING PLAN LEVEL 1
Notes:1. ALL DIMENSIONS ARE FROM CENTER OF COLUMNS2. REFER TO SCHEDULES AND ELEVATIONS FOR HEIGHTSPECIFICATIONS3. ALL HEIGHTS ARE TAKEN FROM AFF TO BOTTOM OF FIXTURE, UNO
V V
1 2 3 4 5 6 7 8 9
A
B
C
4' -
0"
TYP.
3' -
0"
8' -
7 1
/2"
5' -
6"
3' - 11 1/2"
5' -
2 3
/4"
8' -
11 1
/2"
15' - 0"
5' -
2"
4' - 0"
1'
- 3
"
3' - 8 1/4" 3' - 2 1/2"
1' -
3"
OPEN TO ABOVE
OPENTOABOVE
TYP.
4' - 4 1/2"
8' -
8 1
/4"
2' -
8"
2' -
8"
2' -
2"
2' - 2"
5' -
11
1/2" 10' - 9 1/2"
11' -
11
7/16
"5'
- 0"
5' -
0"
5' -
0"5'
- 0"
5' -
0"5'
- 0"
2' - 1" 5' - 0" 5' - 0" 5' - 0" 5' - 0"
6' - 0" 3' - 3 1/4"
1' -
1 1
/2"
3' -
10" 3' - 2" 3' - 2" 2' - 5 3/4"
F-2 F-2
F-3
S2
F-1F-1
F-1 F-1F-1
s7s8
S7
S7
S7
F-7
F-5
F-5
F-5
F-5
F-5
F-5
F-5
F-5
F-5
F-4
F-4 F-4
F-4
F-6
F-3F-5
F-5 F-5
F-5 F-5F-5 F-5
F-5F-5F-5F-5
F-5 F-5 F-5
F-6
F-6
S2
S8
S8S8
S1 S1 S1 S1
S1S1S1S1
S1 S1 S1
S1 S1
S1
S1
S1
ssss9 10 11 12
S9 S9
S10
S11
S11
S11
S11
S11
S11
S11
S12
S12S12
S12
S12
s s13 14
S14S13
EMPLOYEELOUNGE
207
LIFT206
CORRIDOR201 WC
204WC205
CONFERENCEROOM
302
EGRESS STAIR202
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
12:5
2 PM
A3.3
REFLECTEDCEILING PLAN
LEVEL 2
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 REFLECTED CEILING PLAN LEVEL 2
Notes:1. ALL DIMENSIONS ARE FROM CENTER OF COLUMNS2. REFER TO SCHEDULES AND ELEVATIONS FOR HEIGHTSPECIFICATIONS3. ALL HEIGHTS ARE TAKEN FROM AFF TO BOTTOM OF FIXTURE, UNO
V V
1 2 3 4 5 6 7 8 9
A
B
C
2' -
10
1/2"
8' - 6 3/4"
5' -
3 1
/2"
9' -
0"9'
- 0"
21' -
5"
3' - 2" 3' - 2"
1' - 11 1/2"
3' -
5"
2' - 4 1/4"
9' -
0"9'
- 0"
6' -
0 1/
2"
9'
- 1
0 3/
4"
3'
- 8
1/2
"9'
- 0"
4' - 6 3/4"
14' - 5"
4' - 6 3/4"7' -
7 1/
4"6'
- 0"
3' - 1"
s
F-8
F-8
F-8F-8
F-8 F-8
F-8F-8
F-8 F-8
F-8
F-2
F-2
F-8
F-8F-2
F-8S2
s15
S15
S15
S15
S15
S15 S15
S15 S15
S15
S15
S15S15
S15 S15
16S16
S16
s s17 18
S17 S18
1/2"
/ 1'
-0"
EGRESS STAIR303
MEETING ROOM304
LOUNGE302
CORRIDOR301 WC
305WC306
LIFT307
EMPLOYEE WORKAREA308
DIRECTORSOFFICE
309
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
12:5
5 PM
A3.4
REFLECTEDCEILING PLAN
LEVEL 3
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 REFLECTED CEILING PLAN LEVEL 3
Notes:1. ALL DIMENSIONS ARE FROM CENTER OF COLUMNS2. REFER TO SCHEDULES AND ELEVATIONS FOR HEIGHTSPECIFICATIONS3. ALL HEIGHTS ARE TAKEN FROM AFF TO BOTTOM OF FIXTURE, UNO
2
B
F-10
F-6
F-10
F-10
F-6
F-6
F-10
F-6
F-10
F-6
AB
C
D
E
B
A
C
E
D
A8.3
1 Elevation 2 - c
2
B
F-6 F-10
F-6
F-10
F-6
F-6
F-10
F-6
F-10
E
F-10D
C
BA
A
B
C
D
E
8' - 7"
10' - 0 1/2"
11' - 4"
3' - 10 1/2"
4' - 9 1/4"
1' - 9 1/2"
2' - 8 1/4"
9' - 2 1/2"
10' - 6 1/4"
14' - 8 1/2"
CENTERED IN ROOM
6' - 4 1/2" 12' - 0 1/4"
6' - 4 1/2" 12' - 0 1/4"
7' -
6 1/
4"
10' -
6 5
/32"
1' -
1 1
/2"
0' -
2 1/
2"
1'
- 0
1/2
"
2' -
0 1/
2"
14' -
2 3
1/32
"
0' -
8 3
/4"
0' -
9 3
/4"
1' -
3"
0' -
0 1
/2"
2' -
5 1/
4"
A8.3
1 Elevation 2 - c
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/2" = 1'-0"
11/7
/201
3 3:
12:5
7 PM
A3.5
ENLARGEDREFLECTED
CEILING PLANS
CheckerAuthor
Issue Date22-3809
1/2" = 1'-0"2
ENLARGED LOWER LEVEL REFLECTEDCEILING PLAN
1/2" = 1'-0"1
ENLARGED LEVEL 1 REFLECTEDCEILING PLAN
Notes:1. ALL DIMENSIONS ARE FROM CENTER OF COLUMNS2. REFER TO SCHEDULES AND ELEVATIONS FOR HEIGHTSPECIFICATIONS3. ALL HEIGHTS ARE TAKEN FROM AFF TO BOTTOM OF FIXTURE, UNO
UP
1 2 3 4 5 6 7 8 9
A
B
C
TYP.
8' -
7 1
/2"
3' - 0"
TYP.
13' - 0"
TYP.
12' - 6"
7' -
5 1/
2"7'
- 6
1/2"
0' -
5 1/
2"7'
- 6
1/2"
8' -
0"
9' - 4" 3' - 2" 3' - 2"
6' - 0 1/2" 7' - 8"
9' -
3 3/
4"8'
- 0"
8' -
0"
8' - 9 1/2" 6' - 0"
13' -
7 3
/4"
13' - 0" 9' - 6"
13' - 2" 14' - 0"
TYP.
12' - 6"
TYP.
12' - 6"
7'
- 4
1/4
"
CLASSROOM003
PROJECTSTORAGE
007
MATERIALSTORAGE
008WC009
WC0010
Mechanical011
EGRESS STAIR012
LIBRARY001
STORAGE004
EGRESS STAIR005
WORKSHOP006
WORKSHOPRECEPTION
002
TOOL CHECKOUT0013
LIFT0014
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
12:5
9 PM
A4.1
ELECTRICAL PLANLOWER LEVEL
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 ELECTRICAL PLAN LOWER LEVEL
Notes:1. All dimensions are O.C. of column unless indicated2. Refer to master legend for specifactions3. All outlets to be mounted 19" AFF, UFO
UP
DN
1 2 3 4 5 6 7 8 9
A
B
C
4' -
6"4'
- 6"
2' -
0 1/
2"1'
- 8
1/2"
3' -
5"
2' - 4 1/4" 6' - 2"
2' - 4 1/4" 6' - 2"
2' -
10
1/2"
5'
- 1
1/2
"
4' - 6" 5' - 6" 5' - 0" 5' - 6"
6' -
4"
@48"
@48"
@48"
@48"
@48"
Egress Stair103
CAFE101
LIFT102
OPEN TO BELOW
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
13:0
3 PM
A4.2
ELECTRICAL PLANLEVEL 1
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 ELECTRICAL PLAN LEVEL 1
Notes:1. All dimensions are O.C. of column unless indicated2. Refer to master legend for specifactions3. All outlets to be mounted 19" AFF, UFO
DNUP
1 2 3 4 5 6 7 8 9
A
B
C
6' -
8"6'
- 8"
5' -
3 1
/2"
8' -
6"5'
- 6"
11' -
4 1
/2"
14' - 1 1/2" 4' - 6 1/2"
9' -
1 1
/2"
4' - 5" 4' - 5" 8' - 0"
@48" @48"
@48"
@48"
@48"
7' -
6 1
/2"
4' -
2 1
/2"
4' - 4 1/2" 4' - 4 1/2" 5' - 8"
13' -
5 3
/4"
12' -
5 3
/4"
6' -
5 1
/2"
13' -
5 3
/4"
LIFT206
EMPLOYEELOUNGE
207
CORRIDOR201
WC204
CONFERENCEROOM
302
EGRESS STAIR202
7' - 0 17/32"8' - 0"
WC205
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
13:0
5 PM
A4.3
ELECTRICAL PLANLEVEL 2
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 ELECTRICAL PLAN LEVEL 2
Notes:1. All dimensions are O.C. of column unless indicated2. Refer to master legend for specifactions3. All outlets to be mounted 19" AFF, UFO
DN
TD
TD
TD
TD
TD TD TD
TD
1 2 3 4 5 6 7 8 9
A
B
C
16' -
5 1
/4"
2' - 2 3/4"4' - 0"
1' -
1"
14
' - 8
"
1' -
1"
15
' - 1
1/2
"3'
- 3"
4' -
7 1
/2"
8' -
0"
4' - 10"
2' -
4 1
/2"
7' - 2 1/2" 2' - 1"
5' - 0" 4' - 11 3/4" 5' - 11"
CORRIDOR301
WC305
DIRECTORSOFFICE
309
MEETING ROOM304
EGRESS STAIR303
LOUNGE302
WC306
LIFT307
EMPLOYEE WORKAREA308
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
13:0
8 PM
A4.4
ELECTRICAL PLANLEVEL 3
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 ELECTRICAL PLAN LEVEL 3
Notes:1. All dimensions are O.C. of column unless indicated2. Refer to master legend for specifactions3. All outlets to be mounted 19" AFF, UFO
1 2 3 4 5 6 7 8 9
A
B
C
CLASSROOM003
PROJECTSTORAGE
007
MATERIALSTORAGE
008WC009
WC0010
Mechanical011
EGRESS STAIR012
LIBRARY001
STORAGE004
EGRESS STAIR005
WORKSHOP006
WORKSHOPRECEPTION
002
TOOL CHECKOUT0013
LIFT0014
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
13:1
0 PM
A5.1
FINISH PLANLOWER LEVEL
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 FINISH PLAN LOWER LEVEL
Notes:1. ALL WALLS, PT-1 UFO2. FOLLOW SCHEDULE FOR FLOORING DIRECTION
UP
DN
1 2 3 4 5 6 7 8 9
A
B
C
Egress Stair103
LIFT102
CAFE101
OPEN TO BELOW
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
13:1
3 PM
A5.2
FINISH PLANLEVEL 1
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 FINISH PLAN LEVEL 1
Notes:1. ALL WALLS, PT-1 UFO2. FOLLOW SCHEDULE FOR FLOORING DIRECTION
DNUP
1 2 3 4 5 6 7 8 9
A
B
C
EGRESS STAIR202
CONFERENCEROOM
302
CORRIDOR201
WC204
LIFT206
EMPLOYEELOUNGE
207
WC205
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
13:1
8 PM
A5.3
FINISH PLANLEVEL 2
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 FINISH PLAN LEVEL 2
Notes:1. ALL WALLS, PT-1 UFO2. FOLLOW SCHEDULE FOR FLOORING DIRECTION
DN
2 3
A
B
C
CORRIDOR301
WC305
DIRECTORSOFFICE
309
MEETING ROOM304
EGRESS STAIR303
WC306
LIFT307
EMPLOYEE WORKAREA308
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
13:2
1 PM
A5.4
FINISH PLANLEVEL 3
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 FINISH PLAN LEVEL 3
Notes:1. ALL WALLS, PT-1 UFO2. FOLLOW SCHEDULE FOR FLOORING DIRECTION
UP
1 2 3 4 5 6 7 8 9
A
B
C
10' -
3 1
/2"
6' - 10" 12' - 6"
3' -
0"
3' -
0"
9' - 11"
25' - 11"
TYP.
R 4'
- 0"
TYP.
8' - 11 3/4"
TYP.
0' -
10"
TYP.
2' -
6"
TYP.
6' - 0"
3' - 10"
3' - 0"
15' -
0"
5' -
2 3/
4"
7' - 2 1/4"10' - 0"
3' -
0"
2' -
5 1/
2"
5' - 0" 5' - 6"
4' -
0"8'
- 9
1/4"
3' - 0"
EQEQ
15' -
0"
5' -
2 3/
4" 7' - 2 1/4" 10' - 0"
2' -
5 1/
2"
3' -
0"
EQEQ
CLASSROOM003
PROJECTSTORAGE
007
MATERIALSTORAGE
008
WC009
WC0010 Mechanical
011
EGRESS STAIR012
LIBRARY001
STORAGE004
EGRESS STAIR005
WORKSHOP006
WORKSHOPRECEPTION
002
TOOL CHECKOUT0013
LIFT0014
3' -
6"
F-1F-2B
F-2B
F-2B
F-2B
F-2B
F-1F-2B
10' - 0"
4' -
0"
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
13:2
5 PM
A6.1
FURNITURE PLANLOWER LEVEL
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 FURNITURE PLAN LOWER LEVEL
BOOKCASE TOBE PURCHASEDAT A LATER TIME
RECEPTION DESKTO BEPURCHASED AT ALATER TIME
TO BEPURCHASED ATA LATER TIME
UP
1 2 3 4 5 6 7 8 9
A
B
C
0' - 5 1/4"1' - 0"
3' - 0"
3' - 0"
OPEN TO BELOW
Egress Stair103
LIFT102
CAFE101
F-2AF-1
F-2A
3' - 0"
3' -
0"
6' - 0"
3' -
0" F-1
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
13:2
8 PM
A6.2
FURNITURE PLANLEVEL 1
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 FURNITURE PLAN LEVEL 1
BAR TO BEPURCHASED AT ALATER TIME
DNUP
1 2 3 4 5 6 7 8 9
A
B
C
1' - 6 1/2"
TYP.2' - 0"
1' -
1"TY
P.
2' -
2"
4' - 0"0' - 9 1/2"
2' -
0"
TYP.
2' -
8"
TYP.
2' - 7 7/8"
2' - 1 9/16"
CONFERENCEROOM
302
WC204CORRIDOR
201
EMPLOYEELOUNGE
207
LIFT206
EGRESS STAIR202
WC205
F-3A
F-4
F-2A
C-2
C-2
F-2A
12' - 6"
3' -
6"
12' - 6"
3' -
6"
F-1
F-1
F-1
F-2B
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
13:3
0 PM
A6.3
FURNITURE PLANLEVEL 2
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 FURNITURE PLAN LEVEL 2
DN
1 2 3 4 5 6 7 8 9
A
B
C
5' - 8 3/4"
EQ EQ
4' -
1 1/
2"
EQ.
CORRIDOR301
WC305
DIRECTORSOFFICE
309
MEETING ROOM304
EGRESS STAIR303
LOUNGE302
WC306
LIFT307
EMPLOYEE WORKAREA308
F-3BF-2A
F-2AF-1
F-1
F-1 FS-1
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
13:3
3 PM
A6.4
FURNITURE PLANLEVEL 3
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"1 FURNITURE PLAN LEVEL 3
Level 10' - 0"
Level 218' - 0"
Level 328' - 0"
Level -1-18' - 0"
1 2 3 4 5 6 7 8 9
TYP.
14' -
0"
9' -
0"1'
- 0"
7' -
11"
9' -
1"TY
P.1'
- 0"
2' -
9"
3' -
0"
2' -
9"
TYP.
8' -
0"
3' - 0"
TYP.
25' - 0"
9' -
11"
9' -
11"
8' -
4 1
/2"CLASSROOM
003
WORKSHOPRECEPTION
002WORKSHOP
006
CORRIDOR201
WC204
WC205
WC306
WC305
CORRIDOR301
Level 10' - 0"
Level 218' - 0"
Level 328' - 0"
Level 542' - 0"
Level -1-18' - 0"
ABC
TYP.
36' - 2 3/4"
36' -
6 1
/2"
LIBRARY001
WORKSHOPRECEPTION
002
CONFERENCEROOM
302WC205
WC306
EMPLOYEELOUNGE
207
EMPLOYEE WORKAREA308
CORRIDOR301
CORRIDOR201
MEETING ROOM304
EGR
ESS
STAI
R30
3
EGR
ESS
STAI
R20
2Eg
ress
Sta
ir10
3EG
RES
S ST
AIR
005
TYP.
10' -
0"
7' -
8"
8' -
2"
7' -
0"
TYP.
8' -
0"
HeightTyp. forLevel 3
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/8" = 1'-0"
11/7
/201
3 3:
13:4
1 PM
A8.1
BUILDINGSECTIONS
CheckerAuthor
Issue Date22-3809
1/8" = 1'-0"2 WEST- EAST SECTION
1/8" = 1'-0"1 SOUTH- NORTH SECTION
Level 10' - 0"
Level 218' - 0"
Level 328' - 0"
Level -1-18' - 0"
2 3
6' -
9 3/
4"7'
- 11
1/4
"
TYP.
3' -
0"
Curtain Wall
DIRECTORSOFFICE
309
EMPLOYEE WORKAREA308
EMPLOYEELOUNGE
207
LIBRARY001
Level 10' - 0"
Level 218' - 0"
Level 328' - 0"
Level 542' - 0"
Level -1-18' - 0"
B
7' -
11 1
/4"
6' -
9 3/
4"
TYP.
3' -
0"
A9.12
LIBRARY001
WORKSHOPRECEPTION
002
EMPLOYEELOUNGE
207
CORRIDOR201
CORRIDOR301
Level 10' - 0"
Level -1-18' - 0"
9
17' -
0"
6' - 3"
WORKSHOP006
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/4" = 1'-0"
11/7
/201
3 3:
13:4
4 PM
A8.2
ENLARGEDSECTIONS
CheckerAuthor
Issue Date22-3809 1/4" = 1'-0"2 ENLARGED STAIR SECTION
1/4" = 1'-0"1 ENLARGED STAIR SECTION 1/4" = 1'-0"3 ENLARGED SECTION
Level 10' - 0"
Level -1-18' - 0"
2 3
F-6
F-10
F-6
F-10
F-10
F-6F-10
F-6
F-10F-6
A @ 15" - 0" AFF
E @ 17" - 0" AFF
A @ 13" - 0" AFF
D @ 15" - 8" AFF
D@ 13" - 3" AFF
B @ 14" - 0" AFF
B @ 16" - 2" AFF
C @ 13" - 0" AFF
E @ 14" - 8" AFF
C @ 16" - 8" AFF
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
1/2" = 1'-0"
11/7
/201
3 3:
13:5
0 PM
A8.3
ELEVATIONS
CheckerAuthor
Issue Date22-3809
1/2" = 1'-0"1 LIGHT FIXTURE ELEVATION
UP
ACID- ETCHED NON-SLIPSTRIPS
TYP.
0' -
2"
TYP.
3' - 4" TYP.
TYP.
0' -
2"
TYP.
0' -
3"
Level -1-18' - 0"
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
3" = 1'-0"
11/7
/201
3 3:
13:5
4 PM
A9.1
STAIR DETAILS
CheckerAuthor
Issue Date22-3809
3" = 1'-0"1 TREAD DETAIL 3" = 1'-0"2 TREAD AND RISER DETAIL
POLISHED STAINLESSSTEEL, 1/2" THICKNESS,WELDED CORNERS
IRON FRAME, 1/2"THICKNESS, WELDEDSEEMS
IRON PLATES TO JOINFRAME PEICES
6" BOLT INTOFOUNDDATION
CONCRETEFOUNDATION
1/2" METAL CYLINDERFRAME, WELDED JOINS,CHROME FINISH
0' - 6"0' - 8"
0' - 8"
Scale
Date
Drawn By
Checked By
Project Number
220 West Illinois StreetChicago, Illinois 60654
Construction Documents
3" = 1'-0"
11/7
/201
3 3:
14:0
0 PM
A9.2
PARTITIONDETAILS
CheckerAuthor
Issue Date22-3809 3" = 1'-0"1 TYP. GYP. PARTITION
5/8" GYP. BD.
4" SOUNDATTENUATIONBATTING
2 1/2" 25 gUAGEMETAL STUD @24" O. C.
TYP. BASE, 3"MDF, PT-2
SCHEDULEDFINISHEDFLOOR
POLISHEDCONCRETECEILING
3" = 1'-0"2 TYP. CHASE WALL
5/8" GYP. BD.
6" SOUNDATTENUATIONBATTING
6 1/2" 25 GUAGEMETAL STUD @24" O. C.
TYP. BASE, 3"MDF, PT-2
SCHEDULEDFINISHEDFLOOR
POLISHEDCONCRETECEILING
3" = 1'-0"3 Section 6
5/8" FIRECODETYPE "C" GYP.BD. TWOLAYERS EACHSIDE
6" SOUNDATTENUATIONBATTING
6 1/2" 25 GUAGEMETAL STUD @24" O. C.
TYP. BASE, 3"MDF, PT-2
SCHEDULEDFINISHEDFLOOR
POLISHEDCONCRETECEILING