AVEVA APM and the Assessment
© 2018 AVEVA Group plc and its subsidiaries. All rights reserved.
Wilco Hekkert
September 2019
Setting the optimum conditions to maximize Asset Performance
Getting ready for the near future of digitalization
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
APM 4.0 EXPLORATION SESSION
Preparing for a successful
APM program
How do you frame a complex area as APM?
Building an overall APM(4.0) business strategy
Asset strategy essentials
Q&A
Sketching the landscape for APM
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Solutions for Maximum Return on Assets
Increase longevity and performance of assets while ensuring safe, reliable environment for the workforce
Digital TransformationThroughout the lifecycle of the asset
© 2018 AVEVA Group plc and its subsidiaries. All rights reserved.5
Enterprise APM offers the broadest and most comprehensive platform with proven technology and industry expertise to optimize asset performance
• Focus on achieving your company objectives through application of risk management principles
• Increasing confidence, from Shop Floor up to Board Level
• Increase reliability and reduce unscheduled downtime
• Improve asset utilization (OEE) and extend equipment life
• Reduce operations, maintenance and inspection costs
For Internal Use Only
APM Frameworks
6
AVEVA APM ASSESSOR’S TEAM
What we actually should do in APM Deployments
7
Creating transparency
We generate a framed TRANSPARENCY
through our APM Assessments over
multipleDIMENSIONS
Connect the Asset Strategy to Corporate Objectives
8
Manage risk and performance to safeguard business continuity
Corporate ObjectivesBusiness Imperatives
StrategyManage Roadmaps, Risks, Costs, Performance
APM FrameworkPeople, Process and Systems
Creating a high degree of confidence / decision support
A clear Line of Sight
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
We BRING all potential, and spot-solutions for
improvement into a clear LINE OF SITE.
So we can SHOW our client the optimal PATH of
DEPLOYMENT.
Asset Strategies Asset Libraries Asset Strategy Execution
Risk Based Thinking as a key element for APM
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
RISK-BASED OVER-MAINTAINED
GoalCost of non-availability (production loss + break down)
Preventive maintenance cost
Total cost
Comfort mode
UNDER-MAINTAINED
Fire fight mode
Optimum Too muchNot enough effort
• Insight into risks - Balance between financial operational and safety risks
• Ever-changing legislation - Complying with environmental and social requirements
• Sharing knowledge - Implement best practices globally
• Continuous improvement – to drive maximum return on industrial assets
Connect the Asset Strategy to Corporate Objectives
Corporate ObjectivesBusiness Imperatives
Overall Asset StrategyManage Risk, Cost, Performance
APM FrameworkPeople, Process and Systems
Creating a high degree of confidence / decision support
10
REACTIVE
PREVENTIVE –
INSPECTIVE
PROACTIVE –PREDICTIVE –PRESCRIPTIVE
Overall Asset Strategy: a well-balanced set of specific strategies (planned & unplanned)
Preventive Maintenance & Inspections plansResult:
Connect the Asset Strategy to Corporate Objectives
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Age-related failure Random failure
▲ARC STUDIES SHOW ONLY 18% OF ASSET FAILURE IS AGE-RELATED. BASED ON THESE DATA, PREVENTIVE MAINTENANCE PROVIDES A BENEFIT FOR JUST 18 PERCENT OF ASSETS, AND MONITORING FOR PREDICTIVE MAINTENANCE IS A RECOMMENDED OPTION FOR THE REST.WWW.ARCWEB.COM/LISTS/POSTS/POST.ASPX?ID=260
Reactive and Preventive Programs
Predictive Technologyfor Early Warnings
Failure Patterns
18%
82%
Become capable of managing the entire blend of asset strategies
Why we need multiple dimensions framingAPM…
12
One‘s bird-eye….
13
You look @ your own way…Pre-colored by your own physics & history…And provide your feedback in your own preferent style…
It is the assembly of dimensions that lets the picture live!
14
Framing Continuous Improvement Programs
15
• Our customers (might) use different industry frameworks that we need to understand
• We need to be able to tie-in, cross-map and tailor to our customer frameworks
• AVEVA now has her OWN versatile APM Industry Reference Framework
• It is included in our AVEVA APM Assessment Practice• For the customer, it is a surprise present in the box!
• It empowers us and the customer to leverage across the enterprise of facilities
A good model to understand a complex world easier:
For Internal Use Only
Our 3 Main Dimensions
16
Business Context
1D
Maintenance & Operations
2DVisual Asset
Condition
3D
For Internal Use Only
The importance of the 3 Dimensions
17
1
2
3
4
5
6
7
89
10
11
12
13
14
Steering Business Objective through APM:
A high level Industry Benchmark, together with Corporate Business Drivers sets the outer ring for the Business Context.The local (regional) Supply Chain position sets the inner ring for the Business Context.
The Maturity Contour expresses the way Asset Performance Management is performing.
The overall Asset Condition determines thefeasible performance rate that can beachieved with the exisiting Asset Base
APM Maturity
Safety & Compliance
Resource Management
Ass
et
Perf
orm
ance
CostM
anaementl
2D
1D
3D
Creating the right conditions for solutions to work
© 2018 AVEVA Group plc and its subsidiaries. All rights reserved.18
What does goodlook like?
People Processes
Systems
Value
Data
Introducingthe APM Assessment
© 2018 AVEVA Group plc and its subsidiaries. All rights reserved.19
Where the AVEVA APM Assessment can help
© 2018 AVEVA Group plc and its subsidiaries. All rights reserved.20
I need to improve overall plant performance
But how do I optimize production at profitable
margin and maintain compliance?
I need a clear understanding of AM improvement
opportunities and an action plan to execute.
Our company has acquired other
businesses, how do we connect and
harmonize our waysof working?
Our company invests in diverse digital technologies,
how do I prepare my organization?
Our company uses a diverse landscape of applications; how can we streamline &
integrate these?
Our company needs to establish a corporate
improvement program; where do I start?
We need to become far more reliable and predictable; how
do I achieve that?
Managing Assets is seen as complex…
21
Asset (Capital) Portfolio?
Asset Management strategy per
category/market?
Asset Costs, Risks & Performance?
Asset Condition?Business Objectives
Organizationson the move
Shareholder Value
Operational drumbeatOrganization
dynamics?
My ideal organization?
Company image & values
Industry Benchmarks?
AVEVA APM Assessment
Asset Data?
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Business Processes?
Systems & Platforms?
Things have to be in balance
22
MANAGERIAL
SHORT TERM
LONG TERM
4. Process optimized
3. Process driven
2. Task optimized
1. Task driven
1. Task driven 3. Process driven 4. Process optimized
Operational Excellence
APM maturity (readiness)
BusinessInformation
Process Information
Engineering Information
AssetInformation
There has to be a balanced working point where operations and maintenance meet each other.Ideally they work in-phase and do not resonate.To achieve true Operational Excellence:• Business processes need to be
streamlined• Supply Chain & Planning drumbeats
need to be in sync• Decision Data sources merge into a
single truth• Organizational behaviors are
congruent with all this
The APM 4.0 Assessment brings the organization systemics to the surface.
For Internal and Partner Use Only
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
AVEVA APM Assessment
The purpose of a solid future plan for APM
23
360◦ Current State Analysis
Future State Roadmap & Action Plan, containing:• Full Report Out document for all organizational levels
containing all relevant findings and explanations.• Prioritized improvement plan for the next 3 years.• High level business case outline, based on the improvement
potentials reported.• A strategic Line of Sight for the location, a maintenance
costing balance and the Asset Condition Overview of the location’s main Assets.
• Score Profile Document reflecting the benchmarked position and relative potentials.
The APM Assessment analyses all key elements of the Current State:
• Company objectives asset performance• Regulatory compliance situation• Organizational structure & capabilities• Assets and asset conditions• Supply chain situation• Operational characteristics & risks• Budgets & spends• Digital Readiness & Cultural Elements
Future Roadmap & Action plan
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Business Context
Maintenance & Operations
Visual Asset Condition
APM Assessments
© 2018 AVEVA Group plc and its subsidiaries. All rights reserved.24
• Understanding current status
• Know where and how to improve
• Prioritize
The APM Assessment and the Reference FrameworkAPM organizations assessed on 14 points
1. Asset Master Data Management 2. Asset performance objectives 3. APM Strategies 4. Planning & Preparation 5. Workflow Management 6. Inventory & Procurement7. Monitoring & KPI's 8. Cost Management & Value Realization 9. Structural Failure Analysis 10. APM Organization 11. Skill & Knowledge Management 12. Sourcing Strategy 13. IT and OT systems 14. Continuous Improvement & Audit
Achieving compliance
Managing resources
Managingassets
Managingbudgets
12
3
4
5
6
78
9
10
11
12
13
14
25
People
SystemsProcess
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Business Value Calculation&
Benchmarking
Maturity (Readiness) Profiling
Asset Condition Overview
The APM Assessment activity scheme
Every company is assessed against the APM Reference Framework.
This provides a full and clear insight on the current state of the location across all competence areas.
The outcomes, benchmark position and recommendations are composed, validated and presented to the location and corporate in a clear Report Out format.
2 3
7
8
4EAM
5
6
1
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.26
AVEVA APM Assessment in practice
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.27
We observe meetings…We observe info materials…We observe processes…We observe cultures…We analyze KPI’s, Documents & Data…We inspect factories…We engage with teams…
CMMS/EAM utilization as a key element
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.28
Process & Systems maturity
The potential of a well utilized CMMS/EAM system:• We analyze historic data dumps of any system• Through a methodology developed over years we discover all
relevant utilization patterns• From these patterns we learn how business processes are
running and what this means in terms of organizational role play
• We plot the outcomes on process-data charts to address improvement potential
Asset Condition Overview
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.29
Drawing the relation between what we analyze and what we see…
Maturity (& Readiness) profiling
30
Through the assessment, done by…
• Interviews• Data collection (evidence finding)• Data analysis• Process walk downs• Plant visits
1.Below maintainable level
2. Significant backlog
3. Reasonably maintained
4.Well maintained
5.Perfectly maintained
Visual Asset Condition Level
1.Static
2. Reactive
3. Planned
4.Proactive
5.Optimized
Asset Performance Management Scan Maturity Levels
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
The financial view for your Asset Management
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.31
Calculating ROI and balancing improvement potential
Balancing Reactive/Proactive workload Trendlining & projecting financial position for APM
Finding your True North
For Internal and Partner Use Only
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Action & work stream map for a digital journey
32
Our customers need an actionable strategy to develop the future; a guideline for their digital improvement journey.Business-wise, every improvement step needs to pay off; directly or through enabling.
As part of our APM Assessment Report Out we make this tangible, prioritized and provide the overall business case as well as the value increments per improvement step.
A roadmap will be built up in logical stages, putting critical enablers in place first before implementing new solutions, processes, organizational changes and whatsoever.
Benchmarking and our best practice library will help us all to determine the ambition level and related targets.
The leveraging power of theAPM FrameworkWhat comes with the AVEVA APM Assessment
© 2018 AVEVA Group plc and its subsidiaries. All rights reserved.33
Fundamental usage of your APM Assessment
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.34
How to utilize your collaborative improvement power
Client APM improvement frameworkRBM
Working PrinciplesERP/EAM
utilization
Predictive Analytics
Site 1 Good Practices
Site 2 Good Practices
Site 3 Good Practices
APM Assessment 1
APM Assessment 2
APM Assessment 3
Risk
Bas
ed M
nt.
Pred
ictive
Anl
.
Oper
ator
insp
ect
Root
Cau
se A
nl.
5S
EAM Utilization
The power of a multi-site approach
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.35
Converting the APM Assessment into a continuous improvement driving system
APM Business Principles, KPI’s & MetricsONE Reference Framework
&Site benchmark
Facilitated program driving towards Business Objectives
APM Assessments – examplesExperiences from last 5 years and ongoing projects
© 2018 AVEVA Group plc and its subsidiaries. All rights reserved.36
Application examples
37
Available success stories will be continuously extended
Typical application APM Assessment 1:Full guidance towards an APM Demand Organization, Data & Systems
Typical application APM Assessment 2:Global APM Continuous Improvement Program, successful for more than 5 years
Typical application APM Assessment 3:Global APM Continuous Improvement Program, successful for more than 8 years
Typical application APM Assessment 4:Digital Readiness Assessment as part of a Global EAM System Deployment
Typical application APM Assessment 5:As lead structure over an Overall PM effectiveness review & revitalization
Typical application APM Assessment 6:As partial Fit-Gap Analysis for Predictive Analytics Implementation & Embedding
Deployment foundation
Typical application APM Assessment 7:Established framework to integrate acquired businesses, harmonizing Organizations, Processes & AM Strategies
Harmonizing processes & way of
working
Harmonize sites & accelerate
integrations
Typical application APM Assessment 8:Process-Systems-Organization fit-gap analysis & Stage gating checkup for multi-stage roadmaps & programs
For Internal Use Only
ADDENDUM:APM 4.0 – Industry 4.0 principlesThe overall plot of core APM Solutions
© 2018 AVEVA Group plc and its subsidiaries. All rights reserved.38
For Internal Use Only
Asset Performance Management 4.0Connecting Person to Asset to Optimize Asset Condition & Performance and Warrant Asset Compliance
linkedin.com/company/aveva
@avevagroup
ABOUT AVEVA AVEVA is a global leader in engineering and industrial software driving digital transformation across the entire asset and operational life cycle of capital-intensive industries.
The company’s engineering, planning and operations, asset performance, and monitoring and control solutions deliver proven results to over 16,000 customers across the globe. Its customers are supported by the largest industrial software ecosystem, including 4,200 partners and 5,700 certified developers. AVEVA is headquartered in Cambridge, UK, with over 4,400 employees at 80 locations in over 40 countries.aveva.com
© 2018 AVEVA Group plc and its subsidiaries. All rights reserved.40